Project No.:
|
09I1M
|
|
Project Name: |
UW-MSN Charter St HP EPC
|
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$175,000,000
|
|
AE Submittal Date: |
3/4/2010 2:00:00 PM |
|
Last Item Update: |
2/4/2010 3:47:12 PM |
|
Comments: |
Advance_Notification_Notice update 01-21-10 LJG
QA#1 posted 12-11-09 LJG
QA#2 posted 01-22-10 LJG
|
|
Invitation file: |
Solicitation EPC 09I1M.doc (586 kB)
|
|
Support file 1: |
Project Descrpt Overview.pdf (95 kB)
|
|
Support file 2: |
EPC Contract 09A2L.pdf (1031 kB)
|
|
Support file 3: |
Exhibit 3_1 ProjectDesriptions.zip (37859 kB)
|
|
Support file 4: |
Shortlist Contract 09A2L.pdf (46 kB)
|
|
Support file 5: |
Screening_Form_EPC.xls (43 kB)
|
|
Support file 6: |
SBC_Waiver.pdf (59 kB)
|
|
Support file 7: |
09A2L_BC_Action.pdf (84 kB)
|
|
Support file 8: |
EPC Schedule.pdf (110 kB)
|
|
Support file 9: |
AEQualUpload_InstructionsAE.pdf (487 kB)
|
|
Support file 10: |
CSHP_Q A-2 _RFQ_EPC_012110.doc (37 kB)
|
|
Support file 11: |
09I1M QA-1 _RFQ_for_EPC_2009 12-11.doc (73 kB)
|
| Click here for a list of AEs interested in this project. |
| |
| Upload Electronic Qualification Submittal.** |
| |
|
**Note that the official AE qualification document shall be as submitted via two hard copies and one electronic (CD/DVD/Flash) copy to the DSF 7th Floor office at 101 E Wilson, Madison, WI 53702 by the deadline in the invitation file above.
|
|
|
Project No.:
|
09K1K
|
|
Project Name: |
WI Union Redevelopment Project
|
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$37,753,000
|
|
AE Submittal Date: |
2/22/2010 |
|
Last Item Update: |
2/3/2010 12:29:07 PM |
|
Comments: |
02.03.10: A typo has been corrected in Qual_Solicit.doc. The change has been highlighted in green and a revision date has been added to the cover of the document. SBH.
|
|
Invitation file: |
Qual_Solicit_Rev.doc (472 kB)
|
|
Support file 1: |
Project_Description.pdf (163 kB)
|
|
Support file 2: |
Contract.doc (307 kB)
|
|
Support file 3: |
Scrn_Frm.xls (72 kB)
|
|
Support file 4: |
Intrvw_Qstns.doc (53 kB)
|
|
Support file 5: |
FRS.xls (149 kB)
|
|
Support file 6: |
CB.pdf (53 kB)
|
|
Support file 7: |
AEQualUpload_InstructionsAE.pdf (486 kB)
|
| Click here for a list of AEs interested in this project. |
| |
| Upload Electronic Qualification Submittal.** |
| |
|
**Note that the official AE qualification document shall be as submitted via two hard copies and one electronic (CD/DVD/Flash) copy to the DSF 7th Floor office at 101 E Wilson, Madison, WI 53702 by the deadline in the invitation file above.
|
|
|
Project No.:
|
09J3Y
|
|
Project Name: |
UW Madison Nursing Science Center
|
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$37,619,000
|
|
AE Submittal Date: |
2/9/2010 2:30:00 PM |
|
Last Item Update: |
2/9/2010 10:36:27 AM |
|
Comments: |
01.15.10: Rate Sheets modified and typo in Qual_Solicittion.doc. SBH.
|
|
Invitation file: |
Qual_Solicittion.doc (430 kB)
|
|
Support file 1: |
Proj_Descrptn.pdf (4913 kB)
|
|
Support file 2: |
Contract.doc (307 kB)
|
|
Support file 3: |
Screen_Form.xls (72 kB)
|
|
Support file 4: |
Interview_Questions.doc (56 kB)
|
|
Support file 5: |
Rate_Sheet_Programming_Only.xls (47 kB)
|
|
Support file 6: |
Rate_Sheet_Full_Services.xls (47 kB)
|
|
Support file 7: |
CB-Act_28.pdf (41 kB)
|
|
Support file 8: |
AEQualUpload_InstructionsAE.pdf (486 kB)
|
| Click here for a list of AEs interested in this project. |
|
|
Project No.:
|
08C4J
|
|
Project Name: |
Co-located Labs-DATCP&WSLH
|
|
Institution: |
ADMINISTRATION/ADMINISTRATIVE FACILITIES
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$22,618,000
|
|
AE Submittal Date: |
2/2/2010 2:30:00 PM |
|
Last Item Update: |
2/5/2010 2:47:05 PM |
|
AE Submitting Qualifications: |
Boer Architects Inc in association with Perkins Eastman, Bray Associates Architects Inc in association with Lord Aeck & Sargent Architecture, Flad Architects, Plunkett Raysich Architects, Strang Inc |
|
AE Shortlist: |
FLAD ARCHITECTS, BOER ARCHITECTS INC in association with PERKINS EASTMAN, STRANG INC, BRAY ASSOCIATES ARCHITECTS INC in association with LORD AECK & SARGENT ARCHITECTURE |
|
|
Project No.:
|
09K1J
|
|
Project Name: |
Central Chiller Installation
|
|
Institution: |
UNIVERSITY OF WISCONSIN/MILWAUKEE CAMPUS
|
|
Location: |
CITY OF MILWAUKEE, Wisconsin
|
|
Construction Cost: |
$5,050,000
|
|
AE Submittal Date: |
2/2/2010 2:30:00 PM |
|
Last Item Update: |
2/9/2010 9:44:56 AM |
|
AE Submitting Qualifications: |
Affiliated Engineers Inc, Boer Architects Inc in association with Epstein, Power Engineers Collaborative LLC, Raasch Associates Inc, Ring & DuChateau, LLP, Syska Hennessy Group Inc |
|
AE Shortlist: |
AFFILIATED ENGINEERS INC, SYSKA HENNESSY GROUP INC, RAASCH ASSOCIATES INC, RING & DUCHATEAU, LLP |
|
|
Project No.:
|
09H2K
|
|
Project Name: |
1 W. Wilson Envelope Repairs
|
|
Institution: |
ADMINISTRATION/ADMINISTRATIVE FACILITIES
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$10,700,000
|
|
AE Submittal Date: |
1/19/2010 2:30:00 PM |
|
Last Item Update: |
1/27/2010 4:24:38 PM |
|
AE Submitting Qualifications: |
Bloom Companies LLC in association with James G. Otto Architect, Boer Architects Inc in association with Thornton Tomasetti Inc, BWZ Architects in association with Quinn Evans Architects, Facility Engineering Inc in association with Wiss Janney Elstner Associates,
GRAEF, InSite Consulting Services LLC in association with DSGW Architects, Inc, Specialty Engineering Group LLC in association with Moody Nolan Inc |
|
AE Shortlist: |
BLOOM COMPANIES LLC in association with JAMES G. OTTO ARCHITECTS, LLC; GRAEF; FACILITY ENGINEERING INC in association with WISS JANNEY ELSTNER ASSOCIATES, BOER ARCHITECTS INC in association with THORNTON TOMASETTI INC |
|
|
Project No.:
|
08J4P
|
|
Project Name: |
Visitor Center/Carriage Museum
|
|
Institution: |
HISTORICAL SOCIETY/WADE HOUSE, GREENBUSH
|
|
Location: |
TOWN OF GREENBUSH, Wisconsin
|
|
Construction Cost: |
$8,100,000
|
|
AE Submittal Date: |
1/5/2010 2:30:00 PM |
|
Last Item Update: |
1/13/2010 4:31:45 PM |
|
AE Submitting Qualifications: |
Boer Architects, Inc in association with Epstein; Bouril Design Studio, LLC in association with Holabird & Root; Bray Associates Architects, Inc in association with Barker Rinker Seacat Architecture; BWZ Architects, Inc in association with Quinn Evans Architects; Dorschner/Associates, Inc in association with Hammond Beeby Rupert Ainge Architects Inc; Engberg Anderson, Inc; Groth Design Group, Inc in association with Verner Johnson, Inc; The Kubala Washatko Architects, Inc; La Dallman Architects, Inc; MartinRiley architects-engineers; Quorum Architects, Inc; River Architects, Inc; Uihlein Wilson Architects |
|
AE Shortlist: |
BOER ARCHITECTS, INC in association with EPSTEIN; LA DALLMAN ARCHITECTS, INC; THE KUBALA WASHATKO ARCHITECTS, INC; AND UIHLEIN WILSON ARCHITECTS |
|
|
Project No.:
|
09A1D
|
|
Project Name: |
Monarch & Segregation Annexes
|
|
Institution: |
CORRECTIONS/TAYCHEEDAH CORRECTIONAL INSTITUTION
|
|
Location: |
CITY OF FOND DU LAC, Wisconsin
|
|
Construction Cost: |
$5,763,800
|
|
AE Submittal Date: |
12/14/2009 2:30:00 PM |
|
Last Item Update: |
2/2/2010 10:16:44 AM |
|
AE Submitting Qualifications: |
Mead & Hunt Inc, Kehoe Henry & Associates Inc, PSA Dewberry with PSA-Dewberry Inc, Somerville Inc, Venture Architects |
|
AE Shortlist: |
VENTURE ARCHITECTS, MEAD & HUNT INC, KEHOE HENRY & ASSOCIATES INC, SOMERVILLE INC |
|
Selected AE: |
Venture Architects |
|
|
Project No.:
|
06E2B
|
|
Project Name: |
Wis Vets Home, Chipppewa Falls
|
|
Institution: |
VETERANS AFFAIRS/VARIOUS
|
|
Location: |
CITY OF CHIPPEWA FALLS, Wisconsin
|
|
Construction Cost: |
$15,850,000
|
|
AE Submittal Date: |
12/3/2009 2:30:00 PM |
|
Last Item Update: |
1/22/2010 9:39:42 AM |
|
AE Submitting Qualifications: |
Architectural Design Group Inc in association with Miller Hanson Partners; Ayres Associates Inc in association with Nelson-Tremain Partnership; Boer Architects Inc in association with PDC Midwest Inc; Cedar Corporation in association with Loebl Schlossman & Hackl; Dimension IV Madison Design Group in association with Sean Bujold & Associates Inc; Engberg Anderson Inc;
Frisbie Architects Inc in association with Nelson-Tremain Partnership; HSR Associates Inc in association with Horty Elving and Associates Inc; Plunkett Raysich Architects; Somerville Inc; Strang Inc in association with Nelson-Tremain Partnership; WAI Continuum |
|
AE Shortlist: |
HSR ASSOCIATES INC in association with HORTY ELVING AND ASSOCIATES INC; STRANG INC in association with NELSON-TREMAIN PARTNERSHIP; AYRES ASSOCIATESE INC in association with NELSON-TREMAIN PARTNERSHIP; FRISBIE ARCHITECTS INC in association with NELSON-TREMAIN PARTNERSHIP |
|
Selected AE: |
Frisbie Architects Inc in association with Nelson-Tremain Partnership |
|
|
Project No.:
|
09I1N
|
|
Project Name: |
UW-MSN CM for WI Energy Initiative
|
|
Institution: |
ADMINISTRATION/
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$100,000,000
|
|
AE Submittal Date: |
10/5/2009 2:00:00 PM |
|
Last Item Update: |
11/9/2009 1:51:51 PM |
|
AE Submitting Qualifications: |
The Boldt Co, CG Schmidt, Gilbane Building Co, JH Findorff & Son Inc, JP Cullen & Sons, Inc, Kraemer Brothers, Miron Construction Co in JVw/Walsh Construction Co, MA Mortenson Construction, PCL Construction Services, Inc |
|
AE Shortlist: |
THE BOLDT COMPANY, CG SCHMIDT, JP CULLEN & SONS, INC, MORTENSON CONSTRUCTION |
|
Selected AE: |
MA Mortenson Company |
|
|
Project No.:
|
09D3L
|
|
Project Name: |
Stout, Memorial Student Center Renov.
|
|
Institution: |
UNIVERSITY OF WISCONSIN/STOUT CAMPUS
|
|
Location: |
CITY OF MENOMONIE, Wisconsin
|
|
Construction Cost: |
$13,833,000
|
|
AE Submittal Date: |
9/22/2009 2:30:00 PM |
|
Last Item Update: |
11/4/2009 8:07:31 AM |
|
AE Submitting Qualifications: |
Ayres Associates Inc in association with Design Plus, Inc; Boer Architects Inc in association with Loebl Schlossman & Hackl; Dorschner Associates Inc in association with Sasaki Associates Inc;
Frisbie Architects Inc in association with Mackey Mitchell Architects; KEE Architecture Inc; PSA Dewberry; SDS Architects Inc; Strang Inc in association with LMN Architects; Uihlein Wilson Architects Inc; Yaggy Colby Associates in association with Kevin Hom & Andrew Goldman Architects PC |
|
AE Shortlist: |
FRISBIE ARCHITECTS INC in association with MACKEY MITCHELL ARCHITECTS; KEE ARCHITECTURE INC; UIHLEIN WILSON ARCHITECTS INC; SDS ARCHITECTS INC |
|
Selected AE: |
FRISBIE ARCHITECTS INC in association with MACKEY MITCHELL ARCHITECTS |
|
|
Project No.:
|
09H2L
|
|
Project Name: |
Preservation Storage Facility
|
|
Institution: |
ADMINISTRATION/ADMINISTRATIVE FACILITIES
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$19,163,700
|
|
AE Submittal Date: |
9/21/2009 2:30:00 PM |
|
Last Item Update: |
10/27/2009 4:09:32 PM |
|
AE Submitting Qualifications: |
BWZ Architects in association with Opus Architects & Engineers, Inc.; Engberg Anderson Inc in association with SmithGroup; KEE Architecture Inc in association with Hammond Beeby Rupert Ainge Architects; PSA Dewberry |
|
AE Shortlist: |
ENGBERG ANDERSON INC in association with SMITHGROUP; PSA DEWBERRY; BWZ ARCHITECTS in association with OPUS ARCHITECTS & ENGINEERS, INC. |
|
Selected AE: |
ENGBERG ANDERSON INC in association with SMITHGROUP |
|
|
Project No.:
|
09H2D
|
|
Project Name: |
UW-MSN Athl/Hockey Fac CM
|
|
Institution: |
ADMINISTRATION/
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$22,292,000
|
|
AE Submittal Date: |
9/3/2009 2:00:00 PM |
|
Last Item Update: |
9/28/2009 1:14:28 PM |
|
AE Submitting Qualifications: |
CD Smith Construction Services, Fond du Lac, WI; Walsh Construction Co, Chicago, Ill; Hunzinger Construction Co, Milwaukee, WI; Miron Construction CO, Neenah, WI; JP Cullen & Sons, Janesville, WI, Vogel Bros Building CO, Madison, WI; KBS Co joint venture with Huffman Facility Dev. Inc, Madison, WI; Gilbane Building Co, Milwaukee, WI; Mortenson Construction Co, Madison, WI; Oscar J Boldt Construction Co, Madison, WI; JH Findorff Construction CO, Madison, WI; CG Schmidt Co, Madison, WI |
|
AE Shortlist: |
Oscar Boldt Co, Madison, WI; Gilbane Building Co, Milwaukee, WI; J H Findorff Co, Madison, WI; Mortenson Construction Co, Madison, WI |
|
Selected AE: |
JH FINDORFF & SON, INC. |
|
|
Project No.:
|
09D2H
|
|
Project Name: |
UWRF South Fork Suites Addition
|
|
Institution: |
UNIVERSITY OF WISCONSIN/RIVER FALLS CAMPUS
|
|
Location: |
CITY OF RIVER FALLS, Wisconsin
|
|
Construction Cost: |
$15,654,000
|
|
AE Submittal Date: |
8/4/2009 2:30:00 PM |
|
Last Item Update: |
9/10/2009 1:55:21 PM |
|
AE Submitting Qualifications: |
Angus Young Associates Inc in association with Treanor Architects, Ayres Associates Inc in association with Design Plus, Inc, Boer Architects Inc in association with Lohan Anderson LLC, Bouril Design Studio in association with KSQ Architects PC, Frisbie Architects Inc in association with Mackey Mitchell Architects, Mayer Helminiak Architects LLC, McMahon, SDS Architects Inc, William Wenzler & Associates Architects Inc |
|
AE Shortlist: |
ANGUS YOUNG ASSOCIATES Inc in association with TREANOR ARECHITECTS, AYRES ASSOCIATES Inc in association with DESIGN PLUS, INC, FRISBIE ARCHITECTS INC in association with MACKEY MITCHELL ARCHITECTS, SDS ARCHITECTS INC |
|
Selected AE: |
SDS Architects Inc |
|
|
Project No.:
|
09D2U
|
|
Project Name: |
Phy Plant Shops/Office Bldg
|
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$4,600,000
|
|
AE Submittal Date: |
7/15/2009 2:00:00 PM |
|
Last Item Update: |
8/12/2009 10:32:50 AM |
|
AE Submitting Qualifications: |
MSI General Contractors, Howard Immel Inc/BSA, Miron Construction Co/Eppstein Uhen, Alexander Co/Bachmann Construction,Tri-North Builders, CD Smith Construction/PRA, JH Findorff/Strand, Ideal Builders/Shulfer Architects, Iconica, Kraemer Bros/Strang, ACS/KBS/Flad, Mortenson Co/Assemblage Architects, Hunzinger Co/Zimmerman Design, CG Schmidt/Bray Architects, JP Cullen & Sons/GRAEFF, |
|
AE Shortlist: |
Kraemer Brothers, Miron Construction, Iconica, Mortenson Construction Co |
|
Selected AE: |
Kraemer Bros, Plain, WI |
|
|
Project No.:
|
08A2E
|
|
Project Name: |
WI Energy Institute
|
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$75,673,000
|
|
AE Submittal Date: |
4/30/2009 2:30:00 PM |
|
Last Item Update: |
6/2/2009 11:11:40 AM |
|
AE Submitting Qualifications: |
Flad & Associates dba Flad Architects with Flad & Associates dba Flad Architects Inc; Hammel Green & Abrahamson Inc in association with Zimmer Gunsul Frasca Architects LLP; HDR Architecture Inc with HDR Archs & Engrs PC; Plunkett Raysich Architects in association with CO Architectsl; Potter Lawson Inc; Strang Inc in association with SmithGroup, Inc.; Yaggy Colby Associates in association with Stantec Consulting Services Inc and Stantec Architecture Ltd and Stantec Consulting Ltd; Zimmerman Architectural Studios Inc |
|
AE Shortlist: |
STRANG INC in association with SMITHGROUP, INC.; PLUNKETT RAYSICH ARCHITECTS in association with CO ARCHTECTS; FLAD & ASSOCIATES dba FLAD ARCHITECTS with FLAD & ASSOCIATES dba FLAD ARCHITECTS INC; POTTER LAWSON INC |
|
Selected AE: |
POTTER LAWSON INC |
|
|
Project No.:
|
09B1U
|
|
Project Name: |
UW Madison Athletics Hockey/Swimming Fac
|
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$22,292,000
|
|
AE Submittal Date: |
4/28/2009 2:30:00 PM |
|
Last Item Update: |
5/28/2009 3:09:38 PM |
|
AE Submitting Qualifications: |
Bray Associates Architects Inc in association with HNTB Architecture and HNTB Corporation, Engberg Anderson Inc in association with Cannon Design and Cannon Design Architecture and Cannon Design dba Cannon Boston Inc, Kahler Slater Inc, Potter Lawson Inc, The Durrant Group Inc in association with JLG Architects, Uihlein Wilson Architects Inc in association with RDG Planning & Design, Zimmerman Architectural Studios Inc in association with Populous |
|
AE Shortlist: |
UIHLEIN WILSON ARCHITECTS INC in association with RDG PLANNING & DESIGN, THE DURRANT GROUP INC in association with JLG ARCHITECTS, POTTER LAWSON INC, KAHLER SLATER INC |
|
Selected AE: |
KAHLER SLATER INC |
|
|
Project No.:
|
09A3E
|
|
Project Name: |
Gordon Commons Complex
|
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$31,695,000
|
|
AE Submittal Date: |
4/21/2009 2:30:00 PM |
|
Last Item Update: |
5/22/2009 4:20:10 PM |
|
AE Submitting Qualifications: |
Angus Young Associates Inc in association with Cuningham Group Architecture, Berners Schober Associates Inc association with VOA Associates Incorporated, Bray Associates Architects Inc in association with Mesher Shing Architects in association with Burt Hill, Engberg Anderson Inc in association with Livermore Edwards & Associates, KEE Architecture Inc in association with Perry Dean Rogers Partners Architects, Potter Lawson Inc in association with Cannon Design, Quality Management Services Inc, Strang Inc in association with MHTN Architects Inc, The Durrant Group Inc in association with Mackey Mitchell Architects, Yaggy Colby Associates in association with Kevin Hom & Andrew Goldman Architects PC, Zingg Design Inc in association with OWP/P |
|
AE Shortlist: |
STRANG INC in association with MHTN ARCHITECTS INC, POTTER LAWSON INC in association with CANNON DESIGN, THE DURRANT GROUP, INC. in association with MACKEY MITCHELL ARCHITECTS, ENGBERG ANDERSON INC in association with LIVERMORE EDWARDS & ASSOCIATES |
|
Selected AE: |
POTTER LAWSON INC in association with CANNON DESIGN |
|
|
Project No.:
|
09A3F
|
|
Project Name: |
Fischer & Wellers Halls Renov.
|
|
Institution: |
UNIVERSITY OF WISCONSIN/WHITEWATER CAMPUS
|
|
Location: |
CITY OF WHITEWATER, Wisconsin
|
|
Construction Cost: |
$7,134,000
|
|
AE Submittal Date: |
4/16/2009 2:30:00 PM |
|
Last Item Update: |
5/15/2009 12:31:26 PM |
|
AE Submitting Qualifications: |
Angus Young Associates Inc in association with Treanor Architects, Boer Architects Inc in association with Lohan Anderson LLC, BWZ Architects, Eppstein Uhen Architects, HGM Architecture Inc, Kehoe Henry & Associates Inc, Mayer Helminiak Architects LLC, McMahon, The Durrant Group Inc, Uihlein Wilson Architects Inc |
|
AE Shortlist: |
BOER ARCHITECTS INC in association with LOHAN ANDERSON LLC, ANGUS YOUNG ASSOCIATES INC in association with TREANOR ARCHITECTS, BWZ ARCHITECTS, UIHLEIN WILSON ARCHITECTS INC |
|
Selected AE: |
UIHLEIN WILSON ARCHITECTS INC |
|
|
Project No.:
|
09B1C
|
|
Project Name: |
North Campus Chiller
|
|
Institution: |
UNIVERSITY OF WISCONSIN/STEVENS POINT CAMPUS
|
|
Location: |
CITY OF STEVENS POINT, Wisconsin
|
|
Construction Cost: |
$6,348,000
|
|
AE Submittal Date: |
4/13/2009 2:30:00 PM |
|
Last Item Update: |
5/15/2009 8:42:15 AM |
|
AE Submitting Qualifications: |
Affiliated Engineers Inc, Arnold & O Sheridan Inc, GRAEF, Grumman Butkus Associates, MEP Associates LLC, Raasch Associates Inc, Ring & DuChateau, LLP; Syska Hennessy Group Inc,
TCGroup Inc in association with Sebesta Blomberg & Associates Inc |
|
AE Shortlist: |
RING & DUCHATEAU, LLP; TCGROUP INC in association with SEBESTA BLOMBERG & ASSOCIATES INC, GRUMMAN BUTKUS ASSOCIATES, RAASCH ASSOCIATES INC |
|
Selected AE: |
RING & DUCHATEAU, LLP |
|
|
Project No.:
|
08K3J
|
|
Project Name: |
OSH New Residence Hall
|
|
Institution: |
UNIVERSITY OF WISCONSIN/OSHKOSH CAMPUS
|
|
Location: |
CITY OF OSHKOSH, Wisconsin
|
|
Construction Cost: |
$25,644,000
|
|
AE Submittal Date: |
3/11/2009 2:30:00 PM |
|
Last Item Update: |
4/23/2009 3:58:06 PM |
|
AE Submitting Qualifications: |
AECOM Technical Services, Inc. and AECOM Services, Inc. and AECOM USA, Inc.; Berners-Schober Associates Inc. in association with VOA Associates Incorporated; Boer Architects, Inc. in association with Lohan Anderson LLC; Bray Associates Architects, Inc. in association with Hanbury Evans Wright Vlattas + Company; Continuum Architects & Planners, S.C. in association with Bostwick Design Partnership; Dorschner|Associates, Inc. in association with Sasaki Associates Inc; Eppstein Uhen Architects; Gensler; KEE Architecture, Inc in association with Treanor Architects; Potter Lawson Inc in association with Cannon Design; SDS Architects, Inc;
Somerville, Inc. in association with Booth Hansen; The Durrant Group Inc in association with Mackey Mitchell Architects; Uihlein/Wilson Architects, Inc.; Zimmerman Architectural Studios, Inc |
|
AE Shortlist: |
BERNERS-SCHOBER ASSOCIATES INC. in association with VOA ASSOCIATES INCORPORATED, THE DURRANT GROUP INC in association with MACKEY MITCHELL ARCHITECTS, SOMERVILLE, INC. in association with BOOTH HANSEN, UIHLEIN/WILSON ARCHITECTS, INC. |
|
Selected AE: |
BERNERS-SCHOBER ASSOCIATES INC. in association with VOA ASSOCIATES INCORPORATED |
|
|
Project No.:
|
07H1H
|
|
Project Name: |
GBY Rose & Wood Hall Remodeling
|
|
Institution: |
UNIVERSITY OF WISCONSIN/GREEN BAY CAMPUS
|
|
Location: |
CITY OF GREEN BAY, Wisconsin
|
|
Construction Cost: |
$5,183,000
|
|
AE Submittal Date: |
2/24/2009 2:30:00 PM |
|
Last Item Update: |
4/9/2009 3:27:17 PM |
|
AE Submitting Qualifications: |
Berners-Schober Associates Inc., Boer Architects, Inc., Continuum Architects & Planners, S.C., HGM Architecture Inc, McMAHON, Somerville, Inc., The Durrant Group, Inc. |
|
AE Shortlist: |
BERNERS-SCHOBER ASSOCIATES INC., McMAHON, SOMERVILLE, INC., THE DURRANT GROUP, INC. |
|
Selected AE: |
BERNERS-SCHOBER ASSOCIATES INC. |
|
|
Project No.:
|
09A2K
|
|
Project Name: |
Capitol Heat and Power Plant Rebuild
|
|
Institution: |
ADMINISTRATION/ADMINISTRATIVE FACILITIES
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$15,000,000
|
|
AE Submittal Date: |
2/23/2009 2:30:00 PM |
|
Last Item Update: |
3/10/2009 9:35:15 AM |
|
AE Submitting Qualifications: |
Black & Veatch Corporation; Hammel, Green and Abrahamson, Inc.; Henneman Engineering, Inc.; Power Egineers Collaborative; Raasch Associates, Inc.; Ring & DuChateau, LLP; TCGroup Inc. in association with Sebasta Blomberg & Associates, Inc |
|
AE Shortlist: |
HENNEMAN ENGINEERING, INC.; POWER ENGINEERS COLLABORATIVE, LLC; RAASCH ASSOCIATES, INC.; RING & DUCHATEAU, LLP |
|
Selected AE: |
Henneman Engineering, Inc. |
|
|
Project No.:
|
09A2L
|
|
Project Name: |
Charter Street Heating Plant Rebuild
|
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$200,000,000
|
|
AE Submittal Date: |
2/23/2009 2:30:00 PM |
|
Last Item Update: |
5/6/2009 10:37:59 AM |
|
AE Submitting Qualifications: |
Black & Veatch Corporation; Jacobs; Luta, Daily & Brain, LLC; Power Engineers Collaborative, LLC in association with Poyry (Appleton), LLC; Sargent & Lundy; Stanley Consultants, Inc.; TC Group, Inc. in association with Sebesta Blomberg & Associates, Inc. |
|
AE Shortlist: |
JACOBS; LUTZ, DAILY & BRAIN, LLC; POWER ENGINEERS COLLABORATIVE, LLC in association with POYRY (APPLETON), LLC; SARGENT & LUNDY |
|
Selected AE: |
Power Engineers Collaborative, LLC in association with Poyry (Appleton), LLC |
|
|
Project No.:
|
08I3G
|
|
Project Name: |
WSHP Chiller No. 1 Repl
|
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$6,920,000
|
|
AE Submittal Date: |
12/15/2008 2:30:00 PM |
|
Last Item Update: |
2/12/2009 4:47:50 PM |
|
AE Submitting Qualifications: |
Affiliated Engineers Inc, Graef, Anhalt, Schloemer & Associates, Inc.; Henneman Engineering, Ring & DuChateau Inc, Syska Hennessy Group; The Durrant Group, Inc. |
|
AE Shortlist: |
SYSKA HENNESSY GROUP, HENNEMAN ENGINEERING, RING & DUCHATEAU INC, AFFILIATED ENGINEERS INC |
|
Selected AE: |
Affiliated Engineers Inc |
|
|
Project No.:
|
08A2B
|
|
Project Name: |
Stout, Harvey Hall Theater Renovation
|
|
Institution: |
UNIVERSITY OF WISCONSIN/STOUT CAMPUS
|
|
Location: |
CITY OF MENOMONIE, Wisconsin
|
|
Construction Cost: |
$3,680,000
|
|
AE Submittal Date: |
11/5/2008 2:30:00 PM |
|
Last Item Update: |
12/10/2008 12:55:33 PM |
|
AE Submitting Qualifications: |
Engberg Anderson, Inc.: Isthmus Architecture, Inc.; Lien and Peterson Architects in association with Hammel, Green and Abrahamson, Inc.; MartinRiley Architects Engineers in association with Sandberg Architecture & Design; Potter Lawson Inc, SDS Architects, Inc; Strang Inc in association with Miller Dunwiddie Architecture, Inc. |
|
AE Shortlist: |
ISTHMUS ARCHITECTURE, INC, SDS ARCHITECTS, INC.; STRANG INC in association with MILLER DUNWIDDIE ARCHITECTURE, INC.; ENGBERG ANDERSON, INC. |
|
Selected AE: |
STRANG INC in association with MILLER DUNWIDDIE ARCHITECTURE, INC. |
|
|
Project No.:
|
08F2E
|
|
Project Name: |
Charter St HP BACT Compliance
|
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$0
|
|
AE Submittal Date: |
9/5/2008 2:30:00 PM |
|
Last Item Update: |
9/12/2008 1:25:30 PM |
|
Selected AE: |
The Titus Group Inc., Milwaukee,Wi |
|
|
Project No.:
|
07E2D
|
|
Project Name: |
Eau Claire, New Student Union
|
|
Institution: |
UNIVERSITY OF WISCONSIN/EAU CLAIRE CAMPUS
|
|
Location: |
CITY OF EAU CLAIRE, Wisconsin
|
|
Construction Cost: |
$38,182,000
|
|
AE Submittal Date: |
6/24/2008 2:30:00 PM |
|
Last Item Update: |
9/4/2008 2:43:31 PM |
|
AE Submitting Qualifications: |
Ayres Associates Inc in association with Holzman Moss Architecture; Bray Associates Architects, Inc. in association with Burt Hill; Horty Elving and Associates Inc; KEE Architecture, Inc in association with Ellerbe Becket; River Architects, Inc. in association with SmithGroup; SDS Architects, Inc in association with Perkins & Will; Strang Inc in association with MHTN Architecture Inc.; Uihlein/Wilson Architects, Inc. in association with RDG Planning & Design;
Workshop Architects, Inc. |
|
AE Shortlist: |
Bray Associates Architects, Inc. in association with Burt Hill; Ayres Associates Inc in association with Holzman Moss Architecture; KEE Architecture, Inc in association with Ellerbe Becket; SDS Architects, Inc in association with Perkins & Will |
|
Selected AE: |
Bray Associates Architects, Inc. in association with Burt Hill |
|
|
Project No.:
|
07L2P
|
|
Project Name: |
GEF 3 Renovation, 4th Flr HVAC & ADA
|
|
Institution: |
ADMINISTRATION/ADMINISTRATIVE FACILITIES
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$3,059,700
|
|
AE Submittal Date: |
6/9/2008 2:30:00 PM |
|
Last Item Update: |
9/4/2008 2:39:44 PM |
|
AE Submitting Qualifications: |
Assemblage Architects, Boer Architects, Inc., Bray Associate Architects, Inc., Mattes Architects & Designers LLC, Strang Inc |
|
AE Shortlist: |
Assemblage Architects, Boer Architects, Inc., Bray Associate Architects, Inc., Mattes Architects & Designers LLC |
|
Selected AE: |
Boer Architects, Inc. |
|
|
Project No.:
|
08B3M
|
|
Project Name: |
La Crosse Residence Hall
|
|
Institution: |
UNIVERSITY OF WISCONSIN/LA CROSSE CAMPUS
|
|
Location: |
CITY OF LA CROSSE, Wisconsin
|
|
Construction Cost: |
$37,281,000
|
|
AE Submittal Date: |
6/3/2008 2:30:00 PM |
|
Last Item Update: |
9/4/2008 2:41:22 PM |
|
AE Submitting Qualifications: |
Eppstein Uhen Architects, HSR Associates, Inc, Plunkett Raysich Architects in association with Vantage Architects Inc, River Architects, Inc. in association with VOA Associates Incorporated, Uihlein/Wilson Architects, Inc. in association with Booth Hansen |
|
AE Shortlist: |
HSR ASSOCIATES, INC.; UIHLEIN/WILSON ARCHITECTS, INC. in association with BOOTH HANSEN; RIVER ARCHITECTS, INC. in association with VOA ASSOCIATES, INCORPORATED; EPPSTEIN UHEN ARCHITECTS |
|
Selected AE: |
EPPSTEIN UHEN ARCHITECTS |
|
|
Project No.:
|
07K2R
|
|
Project Name: |
New Residence Hall
|
|
Institution: |
UNIVERSITY OF WISCONSIN/STEVENS POINT CAMPUS
|
|
Location: |
CITY OF STEVENS POINT, Wisconsin
|
|
Construction Cost: |
$19,444,000
|
|
AE Submittal Date: |
4/21/2008 |
|
Last Item Update: |
5/29/2008 8:45:08 AM |
|
AE Submitting Qualifications: |
Bray Associates Architects, Inc. in association with Cannon Design; Continuum Architects + Planners, S.C. in association with Bostwick Design Partnership; Engberg Anderson, Inc. in association with Mackey Mitchell Architects, P.C.; Eppstein Uhen Architects, Inc.; Mayer Helminiak Architects, LLC; Mudrovich Architects in association with DMJM H&N, Inc.; Revelations Architects/Builders in association with KSQ Architects, PC; SDS Architects, Inc.; Somerville, Inc. in association with VOA Associates Incorporated |
|
AE Shortlist: |
SOMERVILLE, INC. in association with VOA ASSOCIATES INCORPORATED, BRAY ASSOCIATES ARCHITECTS, INC. in association with CANNON DESIGN, ENGBERG ANDERSON, INC. in association with MACKEY MITCHELL ARCHITECTS, EPPSTEIN UHEN ARCHITECTS, INC. |
|
Selected AE: |
ENGBERG ANDERSON, INC. in association with MACKEY MITCHELL ARCHITECTS |
|
|
Project No.:
|
08B4a
|
|
Project Name: |
Constr Mgr for Union South
|
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$66,770,000
|
|
AE Submittal Date: |
4/16/2008 |
|
Last Item Update: |
5/20/2008 4:24:05 PM |
|
AE Shortlist: |
Short listed CMAR: CG Schmidt Construction Co, Gilbane Bldg Co jv with Tri North Co, J.H. Findorff jv with Mortenson, Oscar Boldt Co |
|
Selected AE: |
Selected CMAR CG Schmidt, Milwaukee & Madison, Wisconsin |
|
|
Project No.:
|
06K2Q
|
|
Project Name: |
OSH Elmwood Remodeling & Addition
|
|
Institution: |
UNIVERSITY OF WISCONSIN/OSHKOSH CAMPUS
|
|
Location: |
CITY OF OSHKOSH, Wisconsin
|
|
Construction Cost: |
$6,219,000
|
|
AE Submittal Date: |
4/3/2008 |
|
Last Item Update: |
6/3/2008 12:44:35 PM |
|
AE Submitting Qualifications: |
KEE Architecture, Durrant, Mattes Architects & Designers, LLC, Boer Architects, Inc. in association with Wydeven arhcitects, LLC, Continuum Architects + Planners, S.C., HGM Architecture, Inc., Plunkett Raysich Architects, LLP, Miller Wagner Coenen/McMahon, Inc., Mead & Hunt, Inc. |
|
AE Shortlist: |
THE DURRANT GROUP, INC., KEE ARCHITECTURE, INC., MEAD & HUNT, INC., MILLER WAGNER COENEN/MCMAHON, INC. |
|
Selected AE: |
KEE ARCHITECTURE, INC. |
|
|
Project No.:
|
07G3L
|
|
Project Name: |
Female Treatment Facility
|
|
Institution: |
HEALTH AND FAMILY SERVICES/WISCONSIN RESOURCE CENTER, WINNEBAGO
|
|
Location: |
CITY OF OSHKOSH, Wisconsin
|
|
Construction Cost: |
$8,544,100
|
|
AE Submittal Date: |
2/6/2008 |
|
Last Item Update: |
3/24/2008 1:15:40 PM |
|
AE Submitting Qualifications: |
Kehoe-Henry and Associates, Inc.; Quantic Architecture LLC in association with Mead & Hunt Inc, Somerville, Inc.; The Durrant Group Inc, Venture Architects |
|
AE Shortlist: |
SOMERVILLE, INC., THE DURRANT GROUP INC, QUANTIC ARCHITECTURE LLC in association with MEAD & HUNT INC, VENTURE ARCHITECTS |
|
Selected AE: |
The Durrant Group, Madison, WI |
|
|
Project No.:
|
07G1X
|
|
Project Name: |
RCI Food Production Facility
|
|
Institution: |
CORRECTIONS/RACINE CORRECTIONAL INSTITUTION, STURTEVANT
|
|
Location: |
VILLAGE OF STURTEVANT, Wisconsin
|
|
Construction Cost: |
$4,391,000
|
|
AE Submittal Date: |
1/29/2008 |
|
Last Item Update: |
3/5/2008 2:39:37 PM |
|
AE Submitting Qualifications: |
Architects Group Limited, Bray Associates Architects, Inc.; Kehoe-Henry and Associates, Inc., Mead & Hunt Inc, The Durrant Group Inc, Venture Architects |
|
AE Shortlist: |
MEAD & HUNT INC, THE DURRANT GROUP INC, VENTURE ARCHITECTS, ARCHITECTS GROUP LIMITED |
|
Selected AE: |
Venture Architects |
|
|
Project No.:
|
07G2U
|
|
Project Name: |
UWMIL Campus Master Plan
|
|
Institution: |
UNIVERSITY OF WISCONSIN/MILWAUKEE CAMPUS
|
|
Location: |
CITY OF MILWAUKEE, Wisconsin
|
|
Construction Cost: |
$0
|
|
AE Submittal Date: |
1/10/2008 |
|
Last Item Update: |
2/22/2008 2:01:13 PM |
|
AE Submitting Qualifications: |
Engberg Anderson , Inc in association with Solomon Cordwell Buenz; Hammel, Green and Abrahamson, Inc. in association with Sasaki Associates Inc; HDR Architecture Inc in association with Loebl Schlossman & Hackl; JJR, LLC in association with Goody Clancy; Uihlein/Wilson Architects, Inc. in association with Booth Hansen and in association with Hargreaves Associates |
|
AE Shortlist: |
Updated 02/13/08: HDR ARCHITECTURE in association with LOEBL SCHLOSSMAN & HACKL, HAMMEL, GREEN AND ABRAHAMSON, INC in association with SASAKI ASSOCIATES, INC, JJR, LLC in association with GOODY CLANCY, ENGBERG ANDERSON, INC in association with SOLOMON CORDWELL BUENZ |
|
Selected AE: |
HAMMEL, GREEN and ABRAHAMSON, INC. in association with SASAKI ASSOCIATES INC |
|
|
Project No.:
|
07E4J
|
|
Project Name: |
Wisconsin Union Redevelopment
|
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$67,520,000
|
|
AE Submittal Date: |
10/24/2007 |
|
Last Item Update: |
2/22/2008 3:21:40 PM |
|
AE Submitting Qualifications: |
Bray Associates Architects, Inc. in association with Cannon Design, Eppstein Uhen Architects in association with Ayers/Saint/Gross, Kahler Slater Architects with association with WTW Architects, KEE Architecture, Inc in association with Perkins & Will, Plunkett Raysich Architects in association with Holzman Moss Architecture, Strang Inc in association with MHTN Architecture Inc., The Durrant Group, Inc. in association with SmithGroup, Toki & Associates, Inc. in association with Kevin Hom + Andrew Goldman Architects PC, Workshop Architects, Inc. in association with Moody Nolan, Inc. |
|
AE Shortlist: |
KAHLER SLATER ARCHITECTS in association with WTW ARCHITECTS, EPPSTEIN UHEN ARCHITECTS in association with AYERS/SAINT/GROSS, PLUNKETT RAYSICH ARCHITECTS in association with HOLZMAN MOSS ARCHITECTURE, WORKSHOP ARCHITECTS, INC. in association with MOODY NOLAN, INC. |
|
Selected AE: |
WORKSHOP ARCHITECTS, INC. in association with MOODY NOLAN, INC. |
|
|
Project No.:
|
07C1N
|
|
Project Name: |
UW MSN Chad/Barnard Renovation PH II
|
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$9,520,000
|
|
AE Submittal Date: |
8/21/2007 |
|
Last Item Update: |
9/26/2007 12:58:30 PM |
|
AE Submitting Qualifications: |
Assemblage Architects, BWZ Architects, HSR Associates, Inc; KEE Architecture, Inc; Uihlein/Wilson Architects, Inc.; William Wenzler & Associates - Architects Inc |
|
AE Shortlist: |
WILLIAM WENZLER & ASSOCIATES – ARCHITECTS, INC., BWZ ARCHITECTS, UIHLEIN/WILSON ARCHITECTS, INC., KEE ARCHITECTURE, INC |
|
Selected AE: |
BWZ ARCHITECTS |
|
|
Project No.:
|
06L2I
|
|
Project Name: |
Randall - Dayton Utility Improvements
|
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$4,061,000
|
|
AE Submittal Date: |
6/26/2007 |
|
Last Item Update: |
8/15/2007 4:11:23 PM |
|
AE Submitting Qualifications: |
Affiliated Engineers Inc, Henneman Engineering, Knight E/A, Inc. Lang Associates, a Division of Clark Dietz, Inc. with Clark Dietz, Inc., Realtime Utility Engineers, Inc., an InfraSource Services Co, Strand Associates, Inc. |
|
AE Shortlist: |
LANG ASSOCIATES, a Division of Clark Dietz, Inc. with CLARK DIETZ, INC., HENNEMAN ENGINEERING, KNIGHT E/A, INC., STRAND ASSOCIATES, INC |
|
Selected AE: |
HENNEMAN ENGINEERING |
|
|
Project No.:
|
07B2F
|
|
Project Name: |
Stout, Hovlid Hall Renovation & Addn
|
|
Institution: |
UNIVERSITY OF WISCONSIN/STOUT CAMPUS
|
|
Location: |
CITY OF MENOMONIE, Wisconsin
|
|
Construction Cost: |
$6,800,000
|
|
AE Submittal Date: |
6/11/2007 |
|
Last Item Update: |
8/24/2007 9:24:48 AM |
|
AE Submitting Qualifications: |
Architects Group Limited, Architectural Design Group, Inc. in association with Mackey Mitchell Architects, Brownhouse, HSR Associates, Inc, Miller Wagner Coenen/McMahon, Inc., SDS Architects, Inc, Short Elliott Hendrickson Inc |
|
AE Shortlist: |
ARCHITECTURAL DESIGN GROUP, INC. in association with MACKEY MITCHELL ARCHITECTS, SDS ARCHITECTS, INC, MILLER WAGNER COENEN/McMAHON, INC., HSR ASSOCIATES, INC |
|
Selected AE: |
SDS ARCHITECTS, INC |
|
|
Project No.:
|
06E1B
|
|
Project Name: |
Armed Forces Reserve Center
|
|
Institution: |
MILITARY AFFAIRS/MADISON
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$29,289,700
|
|
AE Submittal Date: |
5/30/2007 |
|
Last Item Update: |
7/13/2007 9:53:08 AM |
|
AE Submitting Qualifications: |
Assemblage Architects, HSR Associates, Inc, Kapur & Associates Inc in association with VOA Associates Incorporated, Mead & Hunt Inc in association with GRW Engineers Inc, Potter Lawson Inc |
|
AE Shortlist: |
POTTER LAWSON INC, ASSEMBLAGE ARCHITECTS, MEAD & HUNT INC in association with GRW ENGINEERS INC, HSR ASSOCIATES, INC |
|
Selected AE: |
HSR ASSOCIATES, INC |
|
|
Project No.:
|
06K2Z
|
|
Project Name: |
UWMAD SoHE Addition & Renovation
|
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$35,255,000
|
|
AE Submittal Date: |
5/16/2007 |
|
Last Item Update: |
6/25/2007 9:41:06 AM |
|
AE Submitting Qualifications: |
BWZ Architects in association with Holabird & Root LLC, Dorschner|Associates, Inc. in association with Sasaki Associates Inc, Engberg Anderson Design Partnership, Inc in association with VOA Associates Incorporated, Eppstein Uhen Architects, HSR Associates, Inc in association with Ross Barney Architects |
|
AE Shortlist: |
BWZ ARCHITECTS in association with HOLABIRD & ROOT LLC, ENGBERG ANDERSON DESIGN PARTNERSHIP, INC in association with VOA ASSOCIATES INCORPORATED, EPPSTEIN UHEN ARCHITECTS, DORSCHNER|ASSOCIATES, INC. in association with SASAKI ASSOCIATES INC |
|
Selected AE: |
Dorschner|Associates, Inc in association with Sasaki Associates Inc |
|
|
Project No.:
|
06B2C
|
|
Project Name: |
Arlington Integr Dairy - Phase II
|
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
|
Location: |
TOWN OF LEEDS, Wisconsin
|
|
Construction Cost: |
|
|
AE Submittal Date: |
4/30/2007 |
|
Last Item Update: |
6/11/2007 9:52:33 AM |
|
AE Submitting Qualifications: |
Following firms to be interviewed on May 25, 2007 9:00 AM Keller Builders Inc. Kaukauna, WI 10:30 AM, DairyBuilding Contractors, Oneida, WI 1:00 PM Bauman Construction Inc., Chippewa Falls, WI 2:30 PM, Brickl Bros. Inc, West Salem, WI ( order of interviews in random order) |
|
Selected AE: |
DairyBuilding Contractors, Oneida, WI |
|
|
Project No.:
|
06K2R
|
|
Project Name: |
Lakeshore Res Halls & Food Ser
|
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$36,498,000
|
|
AE Submittal Date: |
4/25/2007 |
|
Last Item Update: |
6/12/2007 5:08:35 PM |
|
AE Submitting Qualifications: |
Dorschner|Associates, Inc. in association with Goody Clancy, Engberg Anderson Design Partnership, Inc in association with Mackey Mitchell Architects, Eppstein Uhen Architects, Mayer Helminiak Architects LLC (Formerly BHS) in association with VOA Associates Incorporated, Uihlein/Wilson Architects, Inc. in association with Booth Hansen, William Wenzler & Associates - Architects Inc, Zimmerman Architectural Studios, Inc |
|
AE Shortlist: |
EPPSTEIN UHEN ARCHITECTS, DORSCHNER|ASSOCIATES, INC in association with GOODY CLANCY, ENGBERG ANDERSON DESIGN PARTNERSHIP, INC in association with MACKEY MITCHELL ARCHITECTS, WILLIAM WENZLER & ASSOCIATES – ARCHITECTS, INC |
|
Selected AE: |
ENGBERG ANDERSON DESIGN PARTNERSHIP, INC. in association with MACKEY MITCHELL ARCHITECTS |
|
|
Project No.:
|
05I2O
|
|
Project Name: |
Communication Arts Renv & Addn
|
|
Institution: |
UNIVERSITY OF WISCONSIN/PARKSIDE CAMPUS
|
|
Location: |
TOWN OF SOMERS, Wisconsin
|
|
Construction Cost: |
$27,132,000
|
|
AE Submittal Date: |
4/19/2007 |
|
Last Item Update: |
6/6/2007 4:51:38 PM |
|
AE Submitting Qualifications: |
BWZ Architects in association with Holabird & Root LLC, Dorschner|Associates, Inc. in association with Harley Ellis Devereaux, Engberg Anderson Design Partnership, Inc in association with Holzman Moss Architecture, Flad & Associates, Hammel, Green and Abrahamson, Inc |
|
AE Shortlist: |
ENGBERG ANDERSON DESIGN PARTNERSHIP, INC in association with HOLZMAN MOSS ARCHITECTURE, HAMMEL, GREEN AND ABRAHAMSON, INC., DORSCHNER|ASSOCIATES, INC. in association with HARLEY ELLIS DEVEREAUX |
|
Selected AE: |
Hammel, Green and Abrahamson, Inc. |
|
|
Project No.:
|
06K1G
|
|
Project Name: |
Suite Style Residence Hall
|
|
Institution: |
UNIVERSITY OF WISCONSIN/PARKSIDE CAMPUS
|
|
Location: |
TOWN OF SOMERS, Wisconsin
|
|
Construction Cost: |
$22,076,000
|
|
AE Submittal Date: |
2/6/2007 |
|
Last Item Update: |
4/4/2007 5:01:50 PM |
|
AE Submitting Qualifications: |
Continuum Architects & Planners, S.C. in association with Bostwick Design Partners, Dorschner|Associates, Inc. in association with Einhorn Yaffee Prescott, Engberg Anderson Design Partnership, Inc. in association with Solomon Cordwell Buenz, Eppstein Uhen Architects,
Excel Engineering, Inc. in association with OPN Architects Inc, KEE Architecture, Inc in association with Mackey Mitchell Architects, Plunkett Raysich Architects, Renner Architects, William Wenzler & Associates - Architects Inc |
|
AE Shortlist: |
Kee Architecture, Engberg Anderson Design Partnership, Eppstein Uhen Architects, William Wenzler & Associates |
|
Selected AE: |
Eppstein Uhen Architects |
|
|
Project No.:
|
05I2Y
|
|
Project Name: |
Swenson Hall
|
|
Institution: |
UNIVERSITY OF WISCONSIN/SUPERIOR CAMPUS
|
|
Location: |
CITY OF SUPERIOR, Wisconsin
|
|
Construction Cost: |
$25,865,000
|
|
AE Submittal Date: |
1/30/2007 |
|
Last Item Update: |
3/20/2007 9:52:59 AM |
|
AE Submitting Qualifications: |
Ayres Associates Inc in association with Harley Ellis Devereaux, Dorschner|Associates, Inc. in association with Einhorn Yaffee Prescott, Excel Engineering, Inc. in association with RDG Pnning & Design, Hammond Beeby Rupert Ainge Inc, HSR Associates, Inc in association with Ross Barney Architects, Kahler Slater Architects, Miller Wagner Coenen/McMahon, Inc. in association with Somerville, Inc., Potter Lawson Inc, SDS Architects, Inc in association with Perkins & Will, Strang Inc in association with SmithGroup, Toki & Associates, Inc. in association with Gensler |
|
AE Shortlist: |
Strang Inc in association with SmithGroup, Potter Lawson Inc, Ayres Associates Inc in association with Harley Ellis Devereaux, HSR Associates, Inc in association with Ross Barney Architects |
|
Selected AE: |
Potter Lawson Inc |
|
|
Project No.:
|
06C1Q
|
|
Project Name: |
UW WW New Residence Hall
|
|
Institution: |
UNIVERSITY OF WISCONSIN/WHITEWATER CAMPUS
|
|
Location: |
CITY OF WHITEWATER, Wisconsin
|
|
Construction Cost: |
$28,251,000
|
|
AE Submittal Date: |
1/22/2007 |
|
Last Item Update: |
3/16/2007 11:37:36 AM |
|
AE Submitting Qualifications: |
Continuum Architects & Planners, S.C. in association with Bostwick Design Partners, Dorschner|Associates, Inc. in association with Einhorn Yaffee Prescott, Engberg Anderson Design Partnership, Inc. in association with Solomon Cordwell Buenz, Eppstein Uhen Architects, KEE Architecture, Inc in association with Mackey Mitchell Architects, Plunkett Raysich Architects, Potter Lawson Inc in association with Cannon Design, Renner Architects, Uihlein/Wilson Architects, Inc. |
|
AE Shortlist: |
UIHLEIN/WILSON ARCHITECTS, INC., POTTER LAWSON INC in association with CANNON DESIGN, EPPSTEIN UHEN ARCHITECTS, CONTINUUM ARCHITECTS & PLANNERS, S.C |
|
Selected AE: |
POTTER LAWSON INC in association with CANNON DESIGN |
|
|
Project No.:
|
06J2N
|
|
Project Name: |
WID-MIR Constr Mgr at Risk
|
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$120,000,000
|
|
AE Submittal Date: |
11/16/2006 |
|
Last Item Update: |
1/19/2007 12:46:36 PM |
|
AE Shortlist: |
Short listed CMAR's : CD Smith, Fond du Lac, WI, Findorf-Mortenson Joint Venture, Madison, WI, Gilbane Bldg Co, Milwaukee, WI, Oscar Boldt Co, Madison, WI |
|
Selected AE: |
1- (Selected) Findorff - Mortenson; 2nd- Oscar Boldt Co; 3rd-CD Smith Co; 4th- Gilbane Co |
|
|
Project No.:
|
05I3N
|
|
Project Name: |
OSH New Academic Building
|
|
Institution: |
UNIVERSITY OF WISCONSIN/OSHKOSH CAMPUS
|
|
Location: |
CITY OF OSHKOSH, Wisconsin
|
|
Construction Cost: |
$36,239,000
|
|
AE Submittal Date: |
11/8/2006 |
|
Last Item Update: |
12/19/2006 4:10:15 PM |
|
AE Submitting Qualifications: |
Ayres Associates Inc in association with SmithGroup, Barrientos Design & Consulting, LLC in association with Goody Clancy, Berners-Schober Associates Inc. in association with VOA Associates Incorporated, Bray Associates Architects, Inc. in association with Perkins & Will,
Continuum Architects & Planners, S.C. in association with Ross Barney Architects, Eppstein Uhen Architects, Excel Engineering, Inc. in association with RDG Planning & Design, Plunkett Raysich Architects in association with Shepley Bulfinch Richardson and Abbott, Potter Lawson Inc, Somerville, Inc., Toki & Associates, Inc. in association with Gensler |
|
AE Shortlist: |
BARRIENTOS DESIGN & CONSULTING, LLC in association with GOODY CLANCY, POTTER LAWSON INC, BERNERS-SCHOBER ASSOCIATES INC. in association with VOA ASSOCIATES INCORPORATED, BRAY ASSOCIATES ARCHITECTS, INC. in association with PERKINS & WILL |
|
Selected AE: |
BERNERS-SCHOBER ASSOCIATES INC. in association with VOA ASSOCIATES INCORPORATED |
|
|
Project No.:
|
05I2Q
|
|
Project Name: |
Stout, Jarvis Hall Renovation & Addition
|
|
Institution: |
UNIVERSITY OF WISCONSIN/STOUT CAMPUS
|
|
Location: |
CITY OF MENOMONIE, Wisconsin
|
|
Construction Cost: |
$26,571,000
|
|
AE Submittal Date: |
10/10/2006 |
|
Last Item Update: |
11/20/2006 2:29:04 PM |
|
AE Submitting Qualifications: |
Ayres Associates Inc in association with SmithGroup, Berners-Schober Associates Inc., Continuum Architects & Planners, S.C. in association with Loebl Schlossman & Hackl, Dorschner|Associates, Inc. in association with Holabird & Root, Hammel, Green and Abrahamson, Inc., Plunkett Raysich Architects, Potter Lawson Inc, SDS Architects, Inc in association with BWBR Architects, Inc., The Durrant Group Inc |
|
AE Shortlist: |
SDS Architects, Inc in association with BWBR Architects, Inc., Berners-Schober Associates Inc, Potter Lawson Inc, Continuum Architects & Planners, S.C. in association with Loebl Schlossman & Hackl |
|
Selected AE: |
SDS Architects, Inc in association with BWBR Architects, Inc., |
|
|
Project No.:
|
06D2P
|
|
Project Name: |
UW MSN Education Bldg Renov & Addition
|
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$22,864,000
|
|
AE Submittal Date: |
10/2/2006 |
|
Last Item Update: |
11/14/2006 3:34:00 PM |
|
AE Submitting Qualifications: |
Dorschner|Associates, Inc. in association with Miller Dunwiddie Architecture, Eppstein Uhen Architects, Hammel, Green and Abrahamson, Inc.; KEE Architecture, Inc, Renner Architects, The Kubala Washatko Architects Inc. in association with HOK Chicago |
|
AE Shortlist: |
HAMMEL, GREEN AND ABRAHAMSON, INC., EPPSTEIN UHEN ARCHITECTS, THE KUBALA WASHATKO ARCHITECTS INC. in association with HOK CHICAGO, DORSCHNER|ASSOCIATES, INC. in association with MILLER DUNWIDDIE ARCHITECTURE |
|
Selected AE: |
HAMMEL, GREEN AND ABRAHAMSON, INC. |
|
|
Project No.:
|
06F1Z
|
|
Project Name: |
Chazen Museum of Art Addition
|
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$29,989,000
|
|
AE Submittal Date: |
9/26/2006 |
|
Last Item Update: |
11/13/2006 4:33:02 PM |
|
AE Submitting Qualifications: |
Berners-Schober Associates Inc. in association with Gwathmey Siegel & Associates Architects, Continuum Architects & Planners, S.C. in association with Machado & Silvetti Associates Inc, Dorschner|Associates, Inc. in association with Bernard Tschumi Architects, Engberg Anderson Design Partnership, Inc in association with Schwartz Silver Architects Inc, Hammel, Green and Abrahamson, Inc., Hammond Beeby Rupert Ainge Inc, La Dallman Architects Inc in association with The Rose Guggenheimer Studio, Potter Lawson Inc in association with E Verner Johnson & Associates Museum Architects & Planners, The Durrant Group Inc in association with Frederick Fisher & Partners Architects, The Kubala Washatko Architects Inc. in association with VJAA |
|
AE Shortlist: |
DALLMAN ARCHITECTS INC in association with THE ROSE GUGGENHEIMER STUDIO, DORSCHNER|ASSOCIATES, INC. in association with BERNARD TSCHUMI ARCHITECTS, BERNERS-SCHOBER ASSOCIATES INC. in association with GWATHMEY SIEGEL & ASSOCIATES, CONTINUUM ARCHITECTS & PLANNERS, S.C. in association with MACHADO & SILVETTI ASSOCIATES INC |
|
Selected AE: |
Continuum Architects & Planners, S.C. in association with Machado & Silvetti Associates Inc |
|
|
Project No.:
|
06D2R
|
|
Project Name: |
New Stadium & Fields Complex
|
|
Institution: |
UNIVERSITY OF WISCONSIN/LA CROSSE CAMPUS
|
|
Location: |
CITY OF LA CROSSE, Wisconsin
|
|
Construction Cost: |
$11,973,000
|
|
AE Submittal Date: |
9/14/2006 |
|
Last Item Update: |
10/30/2006 3:01:51 PM |
|
AE Submitting Qualifications: |
Berners-Schober Associates Inc., Hammel, Green and Abrahamson, Inc. in association with Donald Eyberg Architects, HSR Associates, Inc in association with RDG Planning & Design, SDS Architects, Inc in association with Ellerbe Becket |
|
AE Shortlist: |
SDS ARCHITECTS, INC in association with ELLERBE BECKET, HSR ASSOCIATES, INC in association with RDG PLANNING & DESIGN, BERNERS-SCHOBER ASSOCIATES INC., HAMMEL, GREEN AND ABRAHAMSON, INC. in association with DONALD EYBERG ARCHITECTS |
|
Selected AE: |
HSR ASSOCIATES, INC in association with RDG PLANNING & DESIGN |
|
|
Project No.:
|
06A1M
|
|
Project Name: |
UW MSN East Campus Utility Improvement
|
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$16,300,000
|
|
AE Submittal Date: |
8/8/2006 |
|
Last Item Update: |
9/25/2006 1:30:17 PM |
|
AE Submitting Qualifications: |
Affiliated Engineers, Inc., Henneman Engineering, Strand Associates, Inc. in association with Ring & DuChateau Inc |
|
AE Shortlist: |
Strand Associates, Inc. in association with Ring & DuChateau Inc, Henneman Engineering, Affiliated Engineers, Inc. |
|
Selected AE: |
Affiliated Engineers, Inc. |
|
|
Project No.:
|
05L1W
|
|
Project Name: |
Jim Dan Hill Library Renov
|
|
Institution: |
UNIVERSITY OF WISCONSIN/SUPERIOR CAMPUS
|
|
Location: |
CITY OF SUPERIOR, Wisconsin
|
|
Construction Cost: |
$5,917,000
|
|
AE Submittal Date: |
7/31/2006 |
|
Last Item Update: |
9/11/2006 3:08:22 PM |
|
AE Submitting Qualifications: |
Ayres Associates Inc in association with Ross Barney+Jankowski Inc, Engberg Anderson Design Partnership, Inc, River Architects, Inc., SDS Architects, Inc, The Durrant Group, Inc. |
|
AE Shortlist: |
Engberg Anderson Design Partnership, Inc, River Architects, Inc., SDS Architects, Inc, The Durrant Group, Inc. |
|
Selected AE: |
River Architects, Inc. |
|
|
Project No.:
|
06B1R
|
|
Project Name: |
Warehouse Rem Arts Relocation
|
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$7,142,000
|
|
AE Submittal Date: |
7/25/2006 |
|
Last Item Update: |
8/31/2006 2:22:21 PM |
|
AE Submitting Qualifications: |
ANGUS YOUNG ASSOCIATES INC in association with OWP/P, ENGBERG ANDERSON DESIGN PARTNERSHIP, INC, HAMMEL, GREEN AND ABRHAMSON, INC |
|
AE Shortlist: |
ANGUS YOUNG ASSOCIATES INC in association with OWP/P, ENGBERG ANDERSON DESIGN PARTNERSHIP, INC, HAMMEL, GREEN AND ABRHAMSON, INC |
|
Selected AE: |
HAMMEL, GREEN AND ABRHAMSON, INC |
|
|
Project No.:
|
05L1D
|
|
Project Name: |
Rothwell Stu Cntr Replacement
|
|
Institution: |
UNIVERSITY OF WISCONSIN/SUPERIOR CAMPUS
|
|
Location: |
CITY OF SUPERIOR, Wisconsin
|
|
Construction Cost: |
$16,575,000
|
|
AE Submittal Date: |
7/19/2006 |
|
Last Item Update: |
9/1/2006 10:35:07 AM |
|
AE Submitting Qualifications: |
Ayres Associates Inc in association with Design Partnership of Cambridge, Dorschner|Associates, Inc., Engberg Anderson Design Partnership, Inc in association with Ellerbe Becket, KEE Architecture, Inc, SDS Architects, Inc in association with Perkins & Will, Workshop Architects, Inc. |
|
AE Shortlist: |
Ayres Associates Inc in association with Design Partnership of Cambridge, Engberg Anderson Design Partnership, Inc in association with Ellerbe Becket, SDS Architects, Inc in association with Perkins & Will, Workshop Architects, Inc. |
|
Selected AE: |
Workshop Architects, Inc. |
|
|
Project No.:
|
06D1T
|
|
Project Name: |
WI Instit for Discovery
|
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$120,000,000
|
|
AE Submittal Date: |
7/18/2006 |
|
Last Item Update: |
9/20/2006 1:09:55 PM |
|
AE Submitting Qualifications: |
Firms nine showing interest in alphabetical order: Eppstein Uhen Arch, Madison & Milw, in association with in association with Perkins + Will, San Francisco & Los Angeles; Flad and Assoc. Madison; HGA Inc Milw & Minneapolis, MN, in association with Foster & Partners, London, England; Kahler Slater Arch Milw, in association with Tsoi/Kobus assoc. Cambridge, MA; Plunket Raysich Arch, Milw, in association with CO Architect, Los Angeles, CA; Skidmore Owins and Merrill, Chicago, IL in association with Engberg Anderson Design, Milw; Smith Group San Francisco CO in association with Ayres Associates, Eau Claire; Uihlein Wilson Arch. Milw, in association with Ballinger, Philadelphia, PA; The Zimmerman Design Group, Milw, in association with HOK Chicago ILL and HOK Atlanta |
|
AE Shortlist: |
Uihlein Wilson Arch., Milw, WI, in association with Ballinger, Philadelphia, PA; Eppstein Uhen Arch. , Madison & Mil in association with Perkins + Will, San Francisco & Los Angeles CA; HGA Inc Milw WI & Minneapolis, Min in association with Foster & Partners, London , England; PRA Arch. Milwaukee, WI in association with CO Architect Los Angeles, CA |
|
Selected AE: |
Rank: 1-Uihlein Wilson - Ballinger, 2-PRA-CO Architects, 3-HGA-Foster, 4-Eppstein Uhen -Perkins Will |
|
|
Project No.:
|
06B3C
|
|
Project Name: |
DHFS SRSTC Expansion
|
|
Institution: |
HEALTH AND FAMILY SERVICES/SECURE TREATMENT FACILITY, MAUSTON
|
|
Location: |
CITY OF MAUSTON, Wisconsin
|
|
Construction Cost: |
$24,100,000
|
|
AE Submittal Date: |
7/13/2006 |
|
Last Item Update: |
8/22/2006 8:44:19 AM |
|
AE Submitting Qualifications: |
Ayres Associates Inc in association with BWBR Architects, Inc., Mead & Hunt Inc in association with Quantic Architecture LLC, Potter Lawson Inc, Venture Architects |
|
AE Shortlist: |
Ayres Associates Inc in association with BWBR Architects, Inc., Mead & Hunt Inc in association with Quantic Architecture LLC, Potter Lawson Inc, Venture Architects |
|
Selected AE: |
Venture Architects |
|
|
Project No.:
|
05D1Y
|
|
Project Name: |
Eau Claire, McPhee Renovation
|
|
Institution: |
UNIVERSITY OF WISCONSIN/EAU CLAIRE CAMPUS
|
|
Location: |
CITY OF EAU CLAIRE, Wisconsin
|
|
Construction Cost: |
$5,215,000
|
|
AE Submittal Date: |
7/11/2006 |
|
Last Item Update: |
8/22/2006 11:15:54 AM |
|
AE Submitting Qualifications: |
APEX Engineering, Berners-Schober Associates Inc., Dorschner|Associates, Inc., Henneman Engineering, SDS Architects, Inc |
|
AE Shortlist: |
Berners-Schober Associates Inc., Dorschner|Associates, Inc., Henneman Engineering, SDS Architects, Inc |
|
Selected AE: |
SDS Architects, Inc |
|
|
Project No.:
|
05I2F
|
|
Project Name: |
Fine Arts HVAC Sys Repl
|
|
Institution: |
UNIVERSITY OF WISCONSIN/RIVER FALLS CAMPUS
|
|
Location: |
CITY OF RIVER FALLS, Wisconsin
|
|
Construction Cost: |
$4,177,600
|
|
AE Submittal Date: |
6/13/2006 |
|
Last Item Update: |
8/1/2006 8:54:50 AM |
|
AE Submitting Qualifications: |
Grumman Butkus Associates, Henneman Engineering, Lang Associates, Inc in association with Clark Dietz, Inc, Power Engineers Collaborative LLC |
|
AE Shortlist: |
LANG ASSOCIATES, INC. in association with CLARK DIETZ, INC, POWER ENGINEERS COLLABORATIVE LLC, GRUMMAN BUTKUS ASSOCIATES |
|
Selected AE: |
GRUMMAN BUTKUS ASSOCIATES |
|
|
Project No.:
|
05I3O
|
|
Project Name: |
La Crosse New Academic Build.
|
|
Institution: |
UNIVERSITY OF WISCONSIN/LA CROSSE CAMPUS
|
|
Location: |
CITY OF LA CROSSE, Wisconsin
|
|
Construction Cost: |
$23,560,000
|
|
AE Submittal Date: |
4/20/2006 |
|
Last Item Update: |
7/13/2006 3:32:43 PM |
|
AE Submitting Qualifications: |
Ayres Associates Inc in joint venture with SJA Architects, Eppstein Uhen Architects, Flad & Associates, Gensler, Hammel, Green and Abrahamson, Inc., HSR Associates, Inc, Potter Lawson Inc, River Architects, Inc., SDS Architects, Inc, Somerville, Inc. |
|
AE Shortlist: |
FLAD & ASSOCIATES, RIVER ARCHITECTS, INC, HAMMEL, GREEN AND ABRAHAMSON, INC, POTTER LAWSON INC |
|
Selected AE: |
RIVER ARCHITECTS, INC |
|
|
Project No.:
|
05I2H
|
|
Project Name: |
UW MSN West Campus Utility Improvement
|
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$18,700,000
|
|
AE Submittal Date: |
3/23/2006 |
|
Last Item Update: |
5/9/2006 11:38:53 AM |
|
AE Shortlist: |
HENNEMAN ENGINEERING, RING & DUCHATEAU INC, SHORT ELLIOTT HENDRICKSON INC in association with POWER ENGINEERS COLLABORATIVE LLC, AFFILIATED ENGINEERS INC |
|
Selected AE: |
RING & DUCHATEAU INC. |
|
|
Project No.:
|
05F1K
|
|
Project Name: |
Biochemistry II, Henry Mall
|
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$70,157,000
|
|
AE Submittal Date: |
3/8/2006 |
|
Last Item Update: |
5/9/2006 11:41:24 AM |
|
AE Shortlist: |
HAMMEL, GREEN AND ABRAHAMSON, INC. in association with TSOI/KOBUS & ASSOCIATES, INC., PLUNKETT RAYSICH ARCHITECTS in association with SHEPLEY BULFINCH RICHARDSON AND ABBOTT, UIHLEIN/WILSON ARCHITECTS, INC. in association with BALLINGER, FLAD & ASSOCIATES |
|
Selected AE: |
FLAD & ASSOCIATES |
|
|
Project No.:
|
05G2W
|
|
Project Name: |
SWVMC - Columbarium Dev Phase III
|
|
Institution: |
VETERANS AFFAIRS/SOUTHERN WISCONSIN VETERANS MEMORIAL CEMETERY
|
|
Location: |
VILLAGE OF UNION GROVE, Wisconsin
|
|
Construction Cost: |
$4,544,700
|
|
AE Submittal Date: |
2/28/2006 |
|
Last Item Update: |
5/9/2006 11:41:42 AM |
|
AE Shortlist: |
TRIBUTE DESIGN SYSTEMS LLC in joint venture with RAMAKER & ASSOCIATES INC, STRAND ASSOCIATES, INC. in association with THE LA GROUP LANDSCAPE ARCHITECTURE & Engineering P C |
|
Selected AE: |
TRIBUTE DESIGN SYSTEMS LLC in joint venture with RAMAKER & ASSOCIATES INC |
|
|
Project No.:
|
05G1L
|
|
Project Name: |
New Drug Abuse Treatment Facility
|
|
Institution: |
CORRECTIONS/DRUG ABUSE CORRECTIONAL CENTER, WINNEBAGO
|
|
Location: |
CITY OF OSHKOSH, Wisconsin
|
|
Construction Cost: |
$11,400,000
|
|
AE Submittal Date: |
2/20/2006 |
|
Last Item Update: |
3/31/2006 12:25:12 PM |
|
AE Shortlist: |
SEAN BUJOLD & ASSOCIATES, INC., in joint venture with HORTY ELVING AND ASSOCIATES INC., VENTURE ARCHITECTS, KEHOE-HENRY AND ASSOCIATES, INC. |
|
Selected AE: |
KEHOE-HENRY AND ASSOCIATES, INC. |
|
|
Project No.:
|
05G1J
|
|
Project Name: |
DOC OCI Food Service Facility
|
|
Institution: |
CORRECTIONS/OAKHILL CORRECTIONAL INSTITUTION, OREGON
|
|
Location: |
TOWN OF OREGON, Wisconsin
|
|
Construction Cost: |
$3,800,000
|
|
AE Submittal Date: |
12/13/2005 |
|
Last Item Update: |
2/9/2006 3:48:26 PM |
|
AE Shortlist: |
ARCHITECTS GROUP LIMITED, BRAY ASSOCIATES ARCHITECTS, INC., KEHOE-HENRY AND ASSOCIATES, INC., PERFORMA, INC. |
|
Selected AE: |
ARCHITECTS GROUP LIMITED |
|
|
Project No.:
|
04J1T
|
|
Project Name: |
UW MSN Univ Ridge Golf Course Expans
|
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$4,088,000
|
|
AE Submittal Date: |
12/7/2005 |
|
Last Item Update: |
2/8/2006 3:05:49 PM |
|
AE Shortlist: |
MELCHERT WALKKY INC., TOKI & ASSOCIATES, INC. in association with JACOBSON GOLF COURSE DESIGN INC., MSA PROFESSIONAL SERVICES, INC. in association with CLYDE JOHNSTON DESIGNS INC., JJR, LLC in association with ROBERT TRENT JONES II LLC |
|
Selected AE: |
JJR, LLC in association with ROBERT TRENT JONES II LLC |
|
|
Project No.:
|
05E1Z
|
|
Project Name: |
Sterling Hall Renovation
|
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$29,345,600
|
|
AE Submittal Date: |
11/15/2005 |
|
Last Item Update: |
1/11/2006 3:05:00 PM |
|
AE Shortlist: |
HAMMEL, GREEN AND ABRAHAMSON, INC., UIHLEIN/WILSON ARCHITECTS, INC. in association with BALLINGER, STRANG, INC., BERNERS-SCHOBER ASSOCIATES, INC. |
|
Selected AE: |
STRANG, INC. |
|
|
Project No.:
|
05D2N
|
|
Project Name: |
GEF 2 - Phase 2 Renovation
|
|
Institution: |
ADMINISTRATION/ADMINISTRATIVE FACILITIES
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$3,862,500
|
|
AE Submittal Date: |
10/20/2005 |
|
Last Item Update: |
2/2/2006 8:17:50 AM |
|
AE Shortlist: |
BRAY ASSOCIATES ARCHITECTS, INC., BWZ ARCHITECTS, DORSCHNER|ASSOCIATES, INC., STRANG, INC. |
|
Selected AE: |
STRANG, INC. |
|
|
Project No.:
|
05C2Q
|
|
Project Name: |
UW MSN Chadbourne Renovation
|
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$4,504,000
|
|
AE Submittal Date: |
9/15/2005 |
|
Last Item Update: |
11/8/2005 10:27:48 AM |
|
AE Shortlist: |
ASSEMBLAGE ARCHITECTS, ENGBERG ANDERSON DESIGN PARTNERSHIP, INC. in association with SOLOMON CORDWELL BUENZ , WILLIAM WENZLER & ASSOCIATES – ARCHITECTS, INC., ROHRBACH ASSOCIATES PC |
|
Selected AE: |
WILLIAM WENZLER & ASSOCIATES – ARCHITECTS, INC. |
|
|
Project No.:
|
05F2F
|
|
Project Name: |
GBY Union Expansion & Remodeling
|
|
Institution: |
UNIVERSITY OF WISCONSIN/GREEN BAY CAMPUS
|
|
Location: |
CITY OF GREEN BAY, Wisconsin
|
|
Construction Cost: |
$4,871,000
|
|
AE Submittal Date: |
8/3/2005 |
|
Last Item Update: |
9/12/2005 9:55:37 AM |
|
AE Shortlist: |
ARCHITECTS GROUP LIMITED in association with MOODY NOLAN, INC., CONTINUUM ARCHITECTS + PLANNERS, S.C., PERFORMA, INC., KEE ARCHITECTURE, INC. |
|
Selected AE: |
KEE ARCHITECTURE, INC. |
|
|
Project No.:
|
05B2G
|
|
Project Name: |
UWO South Campus Parking Ramp
|
|
Institution: |
UNIVERSITY OF WISCONSIN/OSHKOSH CAMPUS
|
|
Location: |
CITY OF OSHKOSH, Wisconsin
|
|
Construction Cost: |
$6,321,000
|
|
AE Submittal Date: |
7/25/2005 |
|
Last Item Update: |
9/12/2005 9:55:15 AM |
|
AE Shortlist: |
GRAEF, ANHALT, SCHLOEMER & ASSOCIATES, INC., ARNOLD & O’SHERIDAN, INC., BLOOM CONSULTANTS, LLC, HARWOOD ENGINEERING CONSULTANTS, LLC |
|
Selected AE: |
BLOOM CONSULTANTS, LLC. |
|
|
Project No.:
|
04I1D
|
|
Project Name: |
UW PLT New Engineering Building
|
|
Institution: |
UNIVERSITY OF WISCONSIN/PLATTEVILLE CAMPUS
|
|
Location: |
CITY OF PLATTEVILLE, Wisconsin
|
|
Construction Cost: |
$21,373,000
|
|
AE Submittal Date: |
6/7/2005 |
|
Last Item Update: |
8/10/2005 9:07:31 AM |
|
AE Shortlist: |
CONTINUUM ARCHITECTS & PLANNERS, S.C. in joint venture with ROSS BARNEY+JANKOWSKI, INC., FLAD & ASSOCIATES, RIVER ARCHITECTS in association with HDR ARCHITECTURE, INC., WELMAN ARCHITECTS, INC. in association with VOA ASSOCIATES, INC. |
|
Selected AE: |
RIVER ARCHITECTS in association with HDR ARCHITECTURE, INC. |
|
|
Project No.:
|
04K1M
|
|
Project Name: |
Student Union Expansion & Admissions Cnt
|
|
Institution: |
UNIVERSITY OF WISCONSIN/PARKSIDE CAMPUS
|
|
Location: |
CITY OF KENOSHA, Wisconsin
|
|
Construction Cost: |
$18,836,000
|
|
AE Submittal Date: |
3/15/2005 |
|
Last Item Update: |
5/10/2005 4:24:19 PM |
|
AE Shortlist: |
BWZ ARCHITECTS in association with VASILKO. HAUSERMAN & ASSOCIATES, INC., PERFORMA INC. in association with ELLERBE BECKET, KAHLER SLATER ARCHITECTS in association with WTW ARCHITECTS. BARRIENTOS DESIGN & CONSULTING, LLC in association with DESIGN PARTNERSHIP OF CAMBRIDGE |
|
Selected AE: |
KAHLER SLATER ARCHITECTS in association with WTW ARCHITECTS |
|
|
Project No.:
|
04L1E
|
|
Project Name: |
UWSP Air Pollution Control Project
|
|
Institution: |
UNIVERSITY OF WISCONSIN/STEVENS POINT CAMPUS
|
|
Location: |
CITY OF STEVENS POINT, Wisconsin
|
|
Construction Cost: |
$15,050,000
|
|
AE Submittal Date: |
3/14/2005 |
|
Last Item Update: |
5/10/2005 4:24:39 PM |
|
AE Shortlist: |
HENNEMAN RAUFEISEN & ASSOCIATES, INC. ,OMNNI ASSOCIATES INC., PCI MANAGEMENT & CONSULTING CO, RAASCH ASSOCIATES, INC. |
|
Selected AE: |
RAASCH ASSOCIATES, INC. |
|
|
Project No.:
|
03D1Q
|
|
Project Name: |
UW WW College of Business & Economics
|
|
Institution: |
UNIVERSITY OF WISCONSIN/WHITEWATER CAMPUS
|
|
Location: |
CITY OF WHITEWATER, Wisconsin
|
|
Construction Cost: |
$30,873,000
|
|
AE Submittal Date: |
3/8/2005 |
|
Last Item Update: |
5/10/2005 4:25:08 PM |
|
AE Shortlist: |
WELMAN ARCHITECTS, INC. in association with VOA ASSOCIATES, INC., PERFORMA INC. in association with ELLERBE BECKET, ANGUS YOUNG ASSOCIATES INC. in association with BURT HILL KOSAR RITTELMAN ASSOCIATES, KAHLER SLATER ARCHITECTS |
|
Selected AE: |
KAHLER SLATER ARCHITECTS |
|
|
Project No.:
|
04H3L
|
|
Project Name: |
Waisman Ctr 6th 7th Floor Renov
|
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$4,522,000
|
|
AE Submittal Date: |
1/24/2005 |
|
Last Item Update: |
3/18/2005 3:30:52 PM |
|
AE Shortlist: |
THE DURRANT GROUP in association with HARLEYELLIS, BERNERS-SCHOBER ASSOCIATES, INC., POTTER LAWSON, INC., STRANG, INC. |
|
Selected AE: |
STRANG, INC. |
|
|
Project No.:
|
00L1B
|
|
Project Name: |
UW PLT Ullsvik Ctr Remodeling & Addition
|
|
Institution: |
UNIVERSITY OF WISCONSIN/PLATTEVILLE CAMPUS
|
|
Location: |
CITY OF PLATTEVILLE, Wisconsin
|
|
Construction Cost: |
$17,404,000
|
|
AE Submittal Date: |
12/29/2004 |
|
Last Item Update: |
3/18/2005 3:30:12 PM |
|
AE Shortlist: |
CONTINUUM ARCHITECTS & PLANNERS, S.C., ANGUS YOUNG ASSOCIATES, INC., ISTHMUS ARCHITECTURE, INC., EPPSTEIN UHEN ARCHITECTS |
|
Selected AE: |
EPPSTEIN UHEN ARCHITECTS |
|
|
Project No.:
|
04B3F
|
|
Project Name: |
UW MSN 21st Century Telecom, Phase I
|
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$3,333,550
|
|
AE Submittal Date: |
11/15/2004 |
|
Last Item Update: |
2/1/2005 11:19:36 AM |
|
AE Shortlist: |
TOKI & ASSOCIATES, INC. in association with INTELLIGENT NETWORK SOLUTIONS, CAMP, DRESSER & McKEE, INC. (Milwaukee, WI; St. Paul, MN; Walnut Creek, CA; Pittsburgh, PA; Chicago, IL), ARNOLD & O'SHERIDAN, INC., KJWW ENGINEERING CONSULTANTS |
|
Selected AE: |
TOKI & ASSOCIATES, INC. in association with INTELLIGENT NETWORK SOLUTIONS |
|
|
Project No.:
|
02K2U
|
|
Project Name: |
Stevens Point, University Ctr Addition
|
|
Institution: |
UNIVERSITY OF WISCONSIN/STEVENS POINT CAMPUS
|
|
Location: |
CITY OF STEVENS POINT, Wisconsin
|
|
Construction Cost: |
$14,482,000
|
|
AE Submittal Date: |
8/25/2004 |
|
Last Item Update: |
10/8/2004 10:19:25 AM |
|
AE Shortlist: |
Continuum Architects & Planners, S.C in joint venture with Dagit/Saylor Architects, Kahler Slater Architects in association with Mackey Mitchell Architects, Workshop Architects, Inc., SDS Architects, Inc. in association with Perkins & Will |
|
Selected AE: |
SDS Architects, Inc. in association with Perkins & Will |
|
|
Project No.:
|
04D1I
|
|
Project Name: |
UW MSN Fredric A Ogg Residence Hall
|
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$28,228,500
|
|
AE Submittal Date: |
5/14/2004 |
|
Last Item Update: |
4/20/2005 10:28:06 AM |
|
AE Shortlist: |
UIHLEIN/WILSON ARCHITECTS, INC. in association with BOOTH HANSEN, ENGBERG ANDERSON DESIGN PARTNERSHIP, INC. in association with SOLOMON CORDWELL BUENZ & ASSOCIATES, INC., POTTER LAWSON, INC. in association with ANTUNOVICH ASSOCIATES, EPPSTEIN UHEN ARCHITECTS |
|
Selected AE: |
UIHLEIN/WILSON ARCHITECTS, INC. in association with BOOTH HANSEN |
|
|
Project No.:
|
04A1W
|
|
Project Name: |
UW MSN Central Campus Utility Imprv
|
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$10,029,000
|
|
AE Submittal Date: |
5/6/2004 |
|
Last Item Update: |
7/2/2004 1:42:00 PM |
|
AE Shortlist: |
HARWOOD ENGINEERING CONSULTANTS, LTD. IN ASSOCIATION WITH RMF ENGINEERING, INC., AFFILIATED ENGINEERS, INC., HENNEMAN, RAUFEISEN & ASSOCIATES, INC., RING & DuCHATEAU, INC. |
|
Selected AE: |
RING & DuCHATEAU, INC. |
|
|
Project No.:
|
03I1F
|
|
Project Name: |
Wild Rose Design Report
|
|
Institution: |
NATURAL RESOURCES/WILD ROSE HATCHERY
|
|
Location: |
TOWN OF ROSE, Wisconsin
|
|
Construction Cost: |
$20,051,700
|
|
AE Submittal Date: |
4/27/2004 |
|
Last Item Update: |
7/2/2004 10:56:30 AM |
|
AE Shortlist: |
Graef, Anhalt, Schloemer & Associates, Inc. in association with Tetra Tech KCM and Tetra Tech KCM, Triad Engineering Incorporated (TEI) in association with Tetra Tech/KCM, Liesch Environmental Services, Inc. in association with Liesch Associates, Inc. and FishPro |
|
Selected AE: |
Liesch Environmental Services, Inc. in association with Liesch Associates, Inc. and FishPro |
|
|
Project No.:
|
03H3J
|
|
Project Name: |
DMA Camp Douglas Readiness Center
|
|
Institution: |
ADMINISTRATION/
|
|
Location: |
VILLAGE OF CAMP DOUGLAS, Wisconsin
|
|
Construction Cost: |
$5,396,000
|
|
AE Submittal Date: |
4/16/2004 |
|
Last Item Update: |
7/2/2004 10:55:25 AM |
|
AE Shortlist: |
HSR ASSOCIATES, INC., BARRIENTOS DESIGN & CONSULTING, LLC. ARCHITECTS GROUP LIMITED, FISCHER-FISCHER-THEIS, INC |
|
Selected AE: |
FISCHER-FISCHER-THEIS, INC |
|
|
Project No.:
|
03D1R
|
|
Project Name: |
Phoenix Sports Exp and Remodel
|
|
Institution: |
UNIVERSITY OF WISCONSIN/GREEN BAY CAMPUS
|
|
Location: |
CITY OF GREEN BAY, Wisconsin
|
|
Construction Cost: |
$23,802,000
|
|
AE Submittal Date: |
2/10/2004 |
|
Last Item Update: |
3/29/2004 3:27:35 PM |
|
AE Shortlist: |
Venture Architects in association with Moody Nolan, Inc., Uihlein/Wilson Architects, Inc. in association with RDG Planning and Design, Berners-Schober Associates, Inc. in association with Rossetti, Potter Lawson Inc in association with Ellerbe Becket |
|
Selected AE: |
Venture Architects in association with Moody Nolan, Inc. |
|
|
Project No.:
|
03G1C
|
|
Project Name: |
UWO Student Rec and Wellness Center
|
|
Institution: |
UNIVERSITY OF WISCONSIN/OSHKOSH CAMPUS
|
|
Location: |
CITY OF OSHKOSH, Wisconsin
|
|
Construction Cost: |
$16,133,000
|
|
AE Submittal Date: |
12/15/2003 |
|
Last Item Update: |
2/20/2004 10:11:54 AM |
|
AE Shortlist: |
Hammel, Green & Abrahamson, Inc., Uihlein/Wilson Architects, Inc. in association with RDG Planning and Design, Bray Associate Architects, Inc. in association with Hastings+Chivetta Architects, Inc., Potter Lawson, Inc. in association with Cannon Design |
|
Selected AE: |
Potter Lawson, Inc. in association with Cannon Design |
|
|
Project No.:
|
03H2L
|
|
Project Name: |
UW WW Connor Center Add & Remodeling
|
|
Institution: |
UNIVERSITY OF WISCONSIN/WHITEWATER CAMPUS
|
|
Location: |
CITY OF WHITEWATER, Wisconsin
|
|
Construction Cost: |
$5,638,000
|
|
AE Submittal Date: |
12/12/2003 |
|
Last Item Update: |
2/20/2004 10:11:16 AM |
|
AE Shortlist: |
KEE Architecture, Inc., Potter Lawson, Inc., BWZ Architects in joint venture with Vasilko.Hauserman & Associates, Inc., Workshop Architects, Inc. |
|
Selected AE: |
Workshop Architects, Inc. |
|
|
Project No.:
|
02G1S
|
|
Project Name: |
UW MSN Interdiscip Research Complex
|
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$133,991,954
|
|
AE Submittal Date: |
12/12/2003 |
|
Last Item Update: |
9/19/2005 4:43:16 PM |
|
AE Shortlist: |
EPPSTEIN UHEN ARCHITECTS in association with NBBJ , KAHLER SLATER ARCHITECTS, INC. in association with DAVIS BRODY BOND, POTTER LAWSON, INC. in association with ZIMMER GUNSUL FRASCA PARTNERSHIP, FLAD & ASSOCIATES, UIHLEIN/WILSON ARCHITECTS, INC. in joint venture with BALLINGER, ZIMMERMAN DESIGN GROUP, INC. in association with HOK, Inc. |
|
Selected AE: |
ZIMMERMAN DESIGN GROUP, INC. in association with HOK, Inc. |
|
|
Project No.:
|
02G3H
|
|
Project Name: |
UW LX New Residence Hall
|
|
Institution: |
UNIVERSITY OF WISCONSIN/LA CROSSE CAMPUS
|
|
Location: |
CITY OF LA CROSSE, Wisconsin
|
|
Construction Cost: |
$17,723,000
|
|
AE Submittal Date: |
7/23/2003 |
|
Last Item Update: |
11/12/2008 8:53:02 AM |
|
AE Shortlist: |
Wenzler Architects, KEE Architecture, Inc. in association with Mackey Mitchell Associates, HSR Associates, Inc., Eppstein Uhen Architects |
|
Selected AE: |
Eppstein Uhen Architects, Inc. |
|
|
Project No.:
|
02I3F
|
|
Project Name: |
UWO Taylor Residence Hall Renov
|
|
Institution: |
UNIVERSITY OF WISCONSIN/OSHKOSH CAMPUS
|
|
Location: |
CITY OF OSHKOSH, Wisconsin
|
|
Construction Cost: |
$3,480,000
|
|
AE Submittal Date: |
5/13/2003 |
|
Last Item Update: |
7/23/2003 3:50:58 PM |
|
AE Shortlist: |
EPPSTEIN UHEN ARCHITECTS, HGM ARCHITECTS, INC. in association with SOLOMON CORDWELL BUENZ & ASSOCIATES, INC., MILLER WAGNER COENEN/McMAHON, INC., UIHLEIN/WILSON ARCHITECTS, INC. |
|
Selected AE: |
UIHLEIN/WILSON ARCHITECTS, INC. |
|
|
Project No.:
|
00I2A
|
|
Project Name: |
DMA Constr US Property & Fiscal Office
|
|
Institution: |
MILITARY AFFAIRS/CAMP DOUGLAS
|
|
Location: |
VILLAGE OF CAMP DOUGLAS, Wisconsin
|
|
Construction Cost: |
$11,053,100
|
|
AE Submittal Date: |
6/13/2002 |
|
Last Item Update: |
8/20/2002 11:26:16 AM |
|
AE Shortlist: |
HSR Associates, Inc., Zimmerman Design Group, Inc., Strang, Inc., Potter Lawson, Inc. |
|
Selected AE: |
Potter Lawson, Inc. |
|
|
Project No.:
|
00D1T
|
|
Project Name: |
New North Campus Res Hall Master Plan
|
|
Institution: |
UNIVERSITY OF WISCONSIN/STOUT CAMPUS
|
|
Location: |
TOWN OF MENOMINEE, Wisconsin
|
|
Construction Cost: |
$12,335,000
|
|
AE Submittal Date: |
6/12/2002 |
|
Last Item Update: |
8/20/2002 11:24:53 AM |
|
AE Shortlist: |
Potter Lawson, Inc., Cedar Corporation in association with Mackey Mitchell Associates, SDS Architects, Inc. in association with Elness Swenson Graham Architects, Inc., Wenzler Architects |
|
Selected AE: |
SDS Architects, Inc. in association with Elness Swenson Graham Architects, Inc. |
|
|
Project No.:
|
02C2M
|
|
Project Name: |
UW PLT Ullrich Hall Renov
|
|
Institution: |
UNIVERSITY OF WISCONSIN/PLATTEVILLE CAMPUS
|
|
Location: |
CITY OF PLATTEVILLE, Wisconsin
|
|
Construction Cost: |
$4,483,000
|
|
AE Submittal Date: |
5/30/2002 |
|
Last Item Update: |
7/23/2002 10:27:47 AM |
|
AE Shortlist: |
HSR Associates, Inc., SDS Architects, Inc., River Architects, The Durrant Group |
|
Selected AE: |
River Architects |
|
|
Project No.:
|
01L4P
|
|
Project Name: |
Charter St. Boilers (104) Overhaul & Rep
|
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$2,270,000
|
|
AE Submittal Date: |
5/24/2002 |
|
Last Item Update: |
8/20/2002 11:23:55 AM |
|
AE Shortlist: |
TC Group, Inc., Raasch Associates, Inc., Henneman Jaspal Engineering Services in association with SEGA, Inc., Jacobs – Green Bay Operations |
|
Selected AE: |
TC Group, Inc. |
|
|
Project No.:
|
02A4U
|
|
Project Name: |
DOC WPN North Cell Hall Plbg Fxt Replace
|
|
Institution: |
CORRECTIONS/WAUPUN CORRECTIONAL INSTITUTION, WAUPUN
|
|
Location: |
CITY OF WAUPUN, Wisconsin
|
|
Construction Cost: |
$2,080,000
|
|
AE Submittal Date: |
4/15/2002 |
|
Last Item Update: |
7/23/2002 11:01:01 AM |
|
AE Shortlist: |
Harwood Engineering Consultants, Ltd., Henneman Jaspal Engineering Services, PSJ Engineering Inc., The Durrant Group |
|
Selected AE: |
PSJ Engineering Inc. |
|
|
Project No.:
|
00J3Q
|
|
Project Name: |
DOC New Health Service - Oakhill
|
|
Institution: |
CORRECTIONS/OAKHILL CORRECTIONAL INSTITUTION, OREGON
|
|
Location: |
TOWN OF OREGON, Wisconsin
|
|
Construction Cost: |
$2,249,100
|
|
AE Submittal Date: |
4/8/2002 |
|
Last Item Update: |
7/31/2002 10:03:41 AM |
|
AE Shortlist: |
Bray Associate Architects, Inc., Somerville, Inc., The Durrant Group, Venture Architects |
|
Selected AE: |
Venture Architects |
|
|
Project No.:
|
99J3O
|
|
Project Name: |
UWMIL Lapham North Wing Remodeling
|
|
Institution: |
UNIVERSITY OF WISCONSIN/MILWAUKEE CAMPUS
|
|
Location: |
CITY OF MILWAUKEE, Wisconsin
|
|
Construction Cost: |
$7,210,000
|
|
AE Submittal Date: |
3/28/2002 |
|
Last Item Update: |
7/23/2002 10:04:33 AM |
|
AE Shortlist: |
Continuum Architects + Planners, S.C., HSR Associates, Inc., The Durrant Group in association with HarleyEllis, Zimmerman Design Group, Inc. |
|
Selected AE: |
Continuum Architects + Planners, S.C. |
|
|
Project No.:
|
00H2W
|
|
Project Name: |
Gruenhagen Hall Fire Sprinkler Systems
|
|
Institution: |
UNIVERSITY OF WISCONSIN/OSHKOSH CAMPUS
|
|
Location: |
CITY OF OSHKOSH, Wisconsin
|
|
Construction Cost: |
$2,860,000
|
|
AE Submittal Date: |
3/28/2002 |
|
Last Item Update: |
6/3/2002 5:09:44 PM |
|
AE Shortlist: |
Arnold & O’Sheridan, Inc., Berners Schober Associates, Inc., PSJ Engineering, Inc., Toki & Associates, Inc., in joint venture with Gage-Babcock & Associates, Inc. |
|
Selected AE: |
PSJ Engineering, Inc. |
|
|
Project No.:
|
02A3T
|
|
Project Name: |
Horicon Marsh International Education Ce
|
|
Institution: |
NATURAL RESOURCES/HORICON WILDLIFE AREA
|
|
Location: |
CITY OF HORICON, Wisconsin
|
|
Construction Cost: |
$2,060,000
|
|
AE Submittal Date: |
3/25/2002 |
|
Last Item Update: |
6/7/2002 8:12:06 AM |
|
AE Shortlist: |
Mayo Corporation, Somerville, Inc., The Durrant Group, The Kubala Washatko Architects, Inc. |
|
Selected AE: |
Mayo Corporation |
|
|
Project No.:
|
00H2D
|
|
Project Name: |
Cemetery Planning
|
|
Institution: |
VETERANS AFFAIRS/WISCONSIN VETERANS HOME, KING
|
|
Location: |
Wisconsin
|
|
Construction Cost: |
$5,204,400
|
|
AE Submittal Date: |
3/22/2002 |
|
Last Item Update: |
6/3/2002 8:50:21 AM |
|
AE Shortlist: |
Central Wisconsin Engineers & Architects, Inc. in association with VOA Associates, Inc., Strand Associates, Inc. in association with Carter and Burgess, Inc., Toki & Associates, Inc. in joint venture with Rae R. Reuss & Associates, Inc., Tribute Design Systems, Inc. |
|
Selected AE: |
Strand Associates, Inc. in association with Carter and Burgess, Inc. |
|
|
Project No.:
|
02A3W
|
|
Project Name: |
UW MDN ResHallsMaint Cole,Sull,Brad,Ogg
|
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$4,342,314
|
|
AE Submittal Date: |
2/18/2002 |
|
Last Item Update: |
4/26/2002 10:19:56 AM |
|
AE Shortlist: |
Arnold & O'Sheridan, Barrientos Design & Consulting, LLC., HSR Associates, Inc., Somerville, Inc. |
|
Selected AE: |
HSR Associates, Inc. |
|
|
Project No.:
|
00J3P
|
|
Project Name: |
Mech Engineering Add & Remode
|
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$25,800,000
|
|
AE Submittal Date: |
1/22/2002 |
|
Last Item Update: |
3/6/2002 4:50:16 PM |
|
AE Shortlist: |
Kahler Slater Architects, Renner Architects, Uihlein/Wilson Architects in joint venture with Ballinger, The Zimmerman Design Group |
|
Selected AE: |
Zimmerman Design Group, Inc. |
|
|
Project No.:
|
00K4A
|
|
Project Name: |
UW MSN Microbial Sciences Building
|
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$78,668,000
|
|
AE Submittal Date: |
11/19/2001 |
|
Last Item Update: |
2/22/2002 2:51:24 PM |
|
AE Shortlist: |
Hammel, Green & Abrahamson, Inc. in assoc. Earl Walls Assoc.; HSR Associates, Inc. in assoc CUH2A; Kahler Slater Architects in assoc Davis Brody Bond, LLC; Plunkett Raysich Architects in assoc Anshen+Allen LA; Potter Lawson, Inc. in assoc Flad & Assoc., Inc.; Zimmerman Design Group in assoc Ellenzweig Assoc., Inc. |
|
Selected AE: |
Plunkett Raysich Architects in assoc Anshen+Allen LA |
|
|
Project No.:
|
01I1P
|
|
Project Name: |
Advanced Food Production Additions and R
|
|
Institution: |
VETERANS AFFAIRS/WISCONSIN VETERANS HOME, KING
|
|
Location: |
TOWN OF WAUPACA, Wisconsin
|
|
Construction Cost: |
$918,100
|
|
AE Submittal Date: |
10/23/2001 |
|
Last Item Update: |
1/4/2002 2:05:27 PM |
|
AE Shortlist: |
Architects Group Limited, Central Wisconsin Engineers & Architects, Henneman-Jaspal Engineering Services, Marathon Engineers/Architects/Planners, LLC |
|
Selected AE: |
Central Wisconsin Engineers & Architects |
|
|
Project No.:
|
00B3T
|
|
Project Name: |
DOC FLCI Infrastructure Improve
|
|
Institution: |
CORRECTIONS/FOX LAKE CORRECTIONAL INSTITUTION, FOX LAKE
|
|
Location: |
TOWN OF FOX LAKE, Wisconsin
|
|
Construction Cost: |
$16,000,000
|
|
AE Submittal Date: |
9/24/2001 |
|
Last Item Update: |
11/19/2001 4:49:50 PM |
|
AE Shortlist: |
Bray Associate Architects, Inc. in association with C.G. Smith Construction, Inc.; DLR Group; The Durrant Group; PTD, Inc. in association with Marathon Engineers/Architects/Planners, LLC. |
|
Selected AE: |
The Durrant Group |
|
|
Project No.:
|
00K1C
|
|
Project Name: |
UWMAD Weeks Hall Addition
|
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$5,000,000
|
|
AE Submittal Date: |
4/4/2001 |
|
Last Item Update: |
6/12/2001 11:58:28 AM |
|
AE Shortlist: |
HSR Associates, Inc., Strang, Inc., Zimmerman Design Group, Inc., Toki & Associates, Inc. in association with Gensler Associates Architects |
|
Selected AE: |
HSR Associates, Inc. |
|
|
Project No.:
|
01C1T
|
|
Project Name: |
UW MSN Crew House
|
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$6,176,000
|
|
AE Submittal Date: |
4/4/2001 |
|
Last Item Update: |
2/28/2002 8:35:36 AM |
|
AE Shortlist: |
Isthmus Architecture, Inc. in association with Turner Brooks Architects, KEE Architecture, Inc. in association with Vincent James Associates, Hammel, Green & Abrahamson, Inc., Graef, Anhalt, Schloemer & Associates, Inc. in association with Engberg Anderson Design Partnership, Inc. |
|
Selected AE: |
KEE Architecture, Inc. in association with Vincent James Associates |
|
|
Project No.:
|
00F1Q
|
|
Project Name: |
Superior, Aquaculture Facility
|
|
Institution: |
UNIVERSITY OF WISCONSIN/SUPERIOR CAMPUS
|
|
Location: |
CITY OF SUPERIOR, Wisconsin
|
|
Construction Cost: |
$2,600,000
|
|
AE Submittal Date: |
1/17/2001 |
|
Last Item Update: |
3/19/2001 2:27:24 PM |
|
AE Shortlist: |
Short Elliott Hendrickson, Inc., G.W. Kortness Associates, Inc. in association with Cooper Engineering Co. Inc. , Louis Wasserman & Associates in association with MSA Professional Services, Inc. |
|
Selected AE: |
Short Elliott Hendrickson, Inc. |
|
|
Project No.:
|
99J3M
|
|
Project Name: |
Chamberlin Hall Renovation
|
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$18,576,000
|
|
AE Submittal Date: |
11/15/2000 |
|
Last Item Update: |
1/7/2001 10:25:07 AM |
|
AE Shortlist: |
ZIMMERMAN DESIGN GROUP, INC.; STRANG, INC.; HSR ASSOCIATES, INC.; RENNER ARCHITECTS |
|
Selected AE: |
RENNER ARCHITECTS |
|
|
Project No.:
|
00F2G
|
|
Project Name: |
DVA Skilled Nursing Facility
|
|
Institution: |
VETERANS AFFAIRS/WISCONSIN VETERANS HOME, UNION GROVE
|
|
Location: |
VILLAGE OF UNION GROVE, Wisconsin
|
|
Construction Cost: |
$13,647,800
|
|
AE Submittal Date: |
11/7/2000 |
|
Last Item Update: |
10/27/2005 4:39:18 PM |
|
AE Shortlist: |
Engberg Anderson Design Partnership in association with Nelson Tremain Partnership, P.A.; Wenzler Architects; Balestrieri-Kehoe & Associates, Inc. in joint venture with Wilmot/Sanz, Inc.; Zimmerman Design Group, Inc. |
|
Selected AE: |
Engberg Anderson Design Partnership in association with Nelson Tremain Partnership |
|
|
Project No.:
|
00F2C
|
|
Project Name: |
Meat/Muscle Science Lab Replacement
|
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$12,600,000
|
|
AE Submittal Date: |
11/7/2000 |
|
Last Item Update: |
1/18/2001 9:44:10 AM |
|
AE Shortlist: |
KJWW ENGINEERING CONSULTANTS; ZIMMERMAN DESIGN GROUP, INC.; MEAD & HUNT, INC.; WENZLER ARCHITECTS |
|
Selected AE: |
KJWW ENGINEERING CONSULTANTS |
|
|
Project No.:
|
99K3Y
|
|
Project Name: |
DOA New Crime Laboratory
|
|
Institution: |
ADMINISTRATION/ADMINISTRATIVE FACILITIES
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$8,378,000
|
|
AE Submittal Date: |
10/11/2000 |
|
Last Item Update: |
12/14/2000 10:44:21 AM |
|
AE Shortlist: |
BHS Architects, Inc. in association with Affiliated Engineers, Inc.; HSR Associates, Inc. in association with CUH2A, Inc. ; Strang, Inc.; The Durrant Group in association with McClaren, Wilson & Lawrie, Inc. |
|
Selected AE: |
BHS Architects, Inc. in association with Affiliated Engineers, Inc |
|
|
Project No.:
|
00F1O
|
|
Project Name: |
NORTHEAST REGIONAL HEADQUARTERS FACILITY
|
|
Institution: |
NATURAL RESOURCES/NORTHEASTERN REGIONAL OFFICE
|
|
Location: |
VILLAGE OF HOWARD, Wisconsin
|
|
Construction Cost: |
$3,900,000
|
|
AE Submittal Date: |
9/20/2000 |
|
Last Item Update: |
11/27/2000 11:16:51 AM |
|
AE Shortlist: |
Berners-Schobers Associates, Strang, Inc., Architects Group, Ltd., Raasch Associates, Inc. |
|
Selected AE: |
Berners-Schober Associates, Inc. |
|
|
Project No.:
|
99K4N
|
|
Project Name: |
River Falls, New Residence Hall
|
|
Institution: |
UNIVERSITY OF WISCONSIN/RIVER FALLS CAMPUS
|
|
Location: |
CITY OF RIVER FALLS, Wisconsin
|
|
Construction Cost: |
$8,965,000
|
|
AE Submittal Date: |
8/16/2000 |
|
Last Item Update: |
10/6/2000 10:34:09 AM |
|
AE Shortlist: |
Zimmerman Design Group, Inc.; DLR Group, Wenzler Architects, HSR Associates, Inc. |
|
Selected AE: |
Wenzler Architects |
|
|
Project No.:
|
00G2V
|
|
Project Name: |
River Falls, Student Union
|
|
Institution: |
UNIVERSITY OF WISCONSIN/RIVER FALLS CAMPUS
|
|
Location: |
CITY OF RIVER FALLS, Wisconsin
|
|
Construction Cost: |
$20,350,000
|
|
AE Submittal Date: |
8/16/2000 |
|
Last Item Update: |
10/6/2000 10:33:38 AM |
|
AE Shortlist: |
Berners Schober Associates, Workshop Architects, Inc. in association with Moody/Nolan, Ltd. Inc.; HSR Associates, Inc. in association with Ellerbe Becket, Inc.; SDS Architects, Inc. |
|
Selected AE: |
Workshop Architects, Inc. in association with Moody/Nolan, Ltd. Inc. |
|
|
Project No.:
|
99J3S
|
|
Project Name: |
UWW Upham Science Addition/Renovation
|
|
Institution: |
UNIVERSITY OF WISCONSIN/WHITEWATER CAMPUS
|
|
Location: |
CITY OF WHITEWATER, Wisconsin
|
|
Construction Cost: |
$16,500,000
|
|
AE Submittal Date: |
8/16/2000 |
|
Last Item Update: |
10/25/2000 3:53:59 PM |
|
AE Shortlist: |
Renner Architects, Plunkett Raysich Architects in association with Earl Walls Associates, Uihlein/Wilson Architects, Inc. in joint venture with Ballinger, HSR Associates, Inc. in association with Ellerbe Becket |
|
Selected AE: |
Uihlein/Wilson Architects, Inc. in joint venture with Ballinger |
|
|
Project No.:
|
99J3R
|
|
Project Name: |
Superior, Gates Phy Ed Addition/Remodel
|
|
Institution: |
UNIVERSITY OF WISCONSIN/SUPERIOR CAMPUS
|
|
Location: |
CITY OF SUPERIOR, Wisconsin
|
|
Construction Cost: |
$14,088,000
|
|
AE Submittal Date: |
8/2/2000 |
|
Last Item Update: |
9/7/2000 3:25:01 PM |
|
AE Shortlist: |
Berners Schober Associates; Somerville, Inc. in association with GW Korness & Associates, Inc.; SDS Architects, Inc.; HSR Associates, Inc., in association with RDG Bussard Dikis |
|
Selected AE: |
SDS Architects, Inc. |
|
|
Project No.:
|
00C5A
|
|
Project Name: |
UW MSN Biotechnology Building Addition
|
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$27,000,000
|
|
AE Submittal Date: |
8/2/2000 |
|
Last Item Update: |
9/20/2000 3:04:46 PM |
|
AE Shortlist: |
HSR Associates, Inc. in association with CUH2A, Inc.; Potter Lawson, Inc. in association with GPR Planners Collaborative, Inc.; Zimmerman Design Group in association with Research Facilities Design; Hammel, Green & Abahamson, Inc. |
|
Selected AE: |
Potter Lawson, Inc. in association with GPR Planners Collaborative, Inc. |
|
|
Project No.:
|
00F3O
|
|
Project Name: |
DOA Info Tech Second Site Computer Fac
|
|
Institution: |
ADMINISTRATION/ADMINISTRATIVE FACILITIES
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$4,630,000
|
|
AE Submittal Date: |
7/11/2000 |
|
Last Item Update: |
4/7/2005 2:12:56 PM |
|
AE Shortlist: |
Affiliated Engineers, Inc.; Arnold & O’Sheridan, Inc.; Grumman Butkus Associates, Durrant Engineers, Inc. |
|
Selected AE: |
Arnold & O'Sheridan, Inc. |
|
|
Project No.:
|
00E2F
|
|
Project Name: |
New Exposition Building
|
|
Institution: |
STATE FAIR PARK/STATE FAIR PARK - WEST ALLIS
|
|
Location: |
CITY OF WEST ALLIS, Wisconsin
|
|
Construction Cost: |
|
|
AE Submittal Date: |
6/14/2000 |
|
Last Item Update: |
7/21/2000 1:14:08 PM |
|
AE Shortlist: |
Renner Architects in association with Bullock, Smith & Partners; Eppstein Uhen Architects in association with RTKL; Durrant Architects in association with Convention Center Design Group; Zimmerman Design Group in association with HOK |
|
Selected AE: |
Eppstein Uhen Architects in association with RTKL |
|
|
Project No.:
|
00C4L
|
|
Project Name: |
UW MSN WI Veterinary Diagnostic Lab
|
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
|
|
AE Submittal Date: |
6/14/2000 |
|
Last Item Update: |
8/3/2000 4:06:59 PM |
|
AE Shortlist: |
HSR Associates, Inc. in association with CUH2A, Inc.; Zimmerman Design Group, Inc. in association with Research Facilities Design; Potter Lawson Inc., in association with HLM Design; Strang Inc. |
|
Selected AE: |
Strang, Inc. |
|
|
Project No.:
|
00D2A
|
|
Project Name: |
Veterinary Med Teaching Hospital
|
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$3,200,000
|
|
AE Submittal Date: |
6/14/2000 |
|
Last Item Update: |
8/2/2000 5:04:23 PM |
|
Selected AE: |
Zimmerman Design Group |
|
|
Project No.:
|
99J3N
|
|
Project Name: |
UWMIL Klotsche Ctr PE Add Remodel Pkg
|
|
Institution: |
UNIVERSITY OF WISCONSIN/MILWAUKEE CAMPUS
|
|
Location: |
CITY OF MILWAUKEE, Wisconsin
|
|
Construction Cost: |
$19,800,000
|
|
AE Submittal Date: |
5/24/2000 |
|
Last Item Update: |
7/6/2000 1:46:06 PM |
|
AE Shortlist: |
Workshop Architects, Inc., Venture Architects, Uihlein/Wilson Architects, Inc. |
|
Selected AE: |
Venture Architects in association with HOK Sports Facilities |
|
|
Project No.:
|
00B5K
|
|
Project Name: |
DNR Building Addition & Remodeling
|
|
Institution: |
NATURAL RESOURCES/SOUTH CENTRAL REGIONAL OFFICE
|
|
Location: |
CITY OF FITCHBURG, Wisconsin
|
|
Construction Cost: |
$3,140,000
|
|
AE Submittal Date: |
5/10/2000 |
|
Last Item Update: |
8/4/2000 1:58:50 PM |
|
AE Shortlist: |
Bray Associates, Inc.; Fischer-Fischer-Theis, Inc.; HSR Associates, Inc.; Plunkett Raysich Architects |
|
Selected AE: |
Fischer-Fischer-Theis, Inc. |
|
|
Project No.:
|
00B6B
|
|
Project Name: |
New Facility OMS #10
|
|
Institution: |
MILITARY AFFAIRS/OSHKOSH
|
|
Location: |
CITY OF OSHKOSH, Wisconsin
|
|
Construction Cost: |
$4,223,200
|
|
AE Submittal Date: |
5/10/2000 |
|
Last Item Update: |
6/21/2000 10:39:45 AM |
|
AE Shortlist: |
Fischer-Fischer-Theis, Inc.; Graef Anhalt Schloemer & Assoc., Inc.; HSR Assoc., Inc.; Short Elliott Hendrickson, Inc. |
|
Selected AE: |
HSR Associates, Inc. |
|
|
Project No.:
|
99K4R
|
|
Project Name: |
Add 50 Cells
|
|
Institution: |
CORRECTIONS/OSHKOSH CORRECTIONAL INSTITUTION, OSHKOSH
|
|
Location: |
CITY OF OSHKOSH, Wisconsin
|
|
Construction Cost: |
$4,189,500
|
|
AE Submittal Date: |
5/3/2000 |
|
Last Item Update: |
6/13/2000 9:09:29 AM |
|
AE Shortlist: |
DLR Group, Durrant Architects, Potter Lawson, Inc.; Venture Architects |
|
Selected AE: |
Potter Lawson, Inc. |
|
|
Project No.:
|
99L6Q
|
|
Project Name: |
DACC Repl Windows / Upgrd HVAC Sys
|
|
Institution: |
CORRECTIONS/DRUG ABUSE CORRECTIONAL CENTER, WINNEBAGO
|
|
Location: |
CITY OF OSHKOSH, Wisconsin
|
|
Construction Cost: |
$5,360,000
|
|
AE Submittal Date: |
5/3/2000 |
|
Last Item Update: |
6/13/2000 10:01:24 AM |
|
AE Shortlist: |
Balestrieri-Kehoe & Assoc., Inc.; DLR Group, PTD, Inc. |
|
Selected AE: |
Balestrieri-Kehoe & Assoc., Inc. |
|
|
Project No.:
|
00B6J
|
|
Project Name: |
DVA New Domiciliary Building
|
|
Institution: |
VETERANS AFFAIRS/WISCONSIN VETERANS HOME, UNION GROVE
|
|
Location: |
VILLAGE OF UNION GROVE, Wisconsin
|
|
Construction Cost: |
$3,000,000
|
|
AE Submittal Date: |
4/12/2000 |
|
Last Item Update: |
6/12/2000 7:36:58 AM |
|
AE Shortlist: |
Plunkett Raysich Architects, HSR Associates, Inc., Zimmerman Design Group, Inc., Hammel, Green & Abrahamson, Inc. |
|
Selected AE: |
Plunkett Raysich Architects |
|
|
Project No.:
|
00A4V
|
|
Project Name: |
Lakeshore State Park
|
|
Institution: |
NATURAL RESOURCES/Lakeshore State Park
|
|
Location: |
CITY OF MILWAUKEE, Wisconsin
|
|
Construction Cost: |
$9,000,000
|
|
AE Submittal Date: |
4/3/2000 |
|
Last Item Update: |
5/2/2000 2:58:49 PM |
|
Selected AE: |
JJR, Incorporated |
|
|
Project No.:
|
99J3L
|
|
Project Name: |
UWGB Lab Sciences Addition & Rmdl
|
|
Institution: |
UNIVERSITY OF WISCONSIN/GREEN BAY CAMPUS
|
|
Location: |
CITY OF GREEN BAY, Wisconsin
|
|
Construction Cost: |
$16,600,000
|
|
AE Submittal Date: |
3/29/2000 |
|
Last Item Update: |
5/17/2000 5:12:50 PM |
|
AE Shortlist: |
Uihlein Wilson Architects Inc. in joint venture with Ballinger, Zimmerman Design Group,Inc., Berners Schober Assoc., Inc., Plunkett Raysich Architects |
|
Selected AE: |
Plunkett Raysich Architects |
|
|
Project No.:
|
99J1C
|
|
Project Name: |
Fine Arts Center Addition and Remodeling
|
|
Institution: |
UNIVERSITY OF WISCONSIN/STEVENS POINT CAMPUS
|
|
Location: |
CITY OF STEVENS POINT, Wisconsin
|
|
Construction Cost: |
$21,557,000
|
|
AE Submittal Date: |
3/22/2000 |
|
Last Item Update: |
5/2/2000 1:30:16 PM |
|
Selected AE: |
Hammel, Green & Abrahamson, Inc. |
|
|
Project No.:
|
99L6M
|
|
Project Name: |
Remodel Cottages 1 and 12
|
|
Institution: |
CORRECTIONS/OAKHILL CORRECTIONAL INSTITUTION, OREGON
|
|
Location: |
Wisconsin
|
|
Construction Cost: |
$3,553,000
|
|
AE Submittal Date: |
3/22/2000 |
|
Last Item Update: |
5/2/2000 3:31:05 PM |
|
Selected AE: |
PTD, Inc. |
|
|
Project No.:
|
00A1U
|
|
Project Name: |
SFP Replace Grandstand
|
|
Institution: |
STATE FAIR PARK/STATE FAIR PARK - WEST ALLIS
|
|
Location: |
CITY OF WEST ALLIS, Wisconsin
|
|
Construction Cost: |
$12,500,000
|
|
AE Submittal Date: |
1/31/2000 |
|
Last Item Update: |
4/21/2000 3:50:41 PM |
|
Selected AE: |
Venture Architects |
|
|
Project No.:
|
99I4U
|
|
Project Name: |
UW Mad. SE Recreation Facility
|
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$6,106,000
|
|
AE Submittal Date: |
12/7/1999 |
|
Last Item Update: |
4/21/2000 4:02:24 PM |
|
Selected AE: |
Bray Associate Architects, Inc. |
|
|
Project No.:
|
99I1F
|
|
Project Name: |
UWMad Witte A&B - Kronshage Hall Remodel
|
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
|
Location: |
CITY OF MADISON, Wisconsin
|
|
Construction Cost: |
$8,288,500
|
|
AE Submittal Date: |
12/7/1999 |
|
Last Item Update: |
4/21/2000 3:49:17 PM |
|
Selected AE: |
Arnold & O'Sheridan, Madison, Wisconsin |
|
|
Project No.:
|
99H3E
|
|
Project Name: |
Segregation / Housing Unit
|
|
Institution: |
CORRECTIONS/TAYCHEEDAH CORRECTIONAL INSTITUTION
|
|
Location: |
TOWN OF TAYCHEEDAH, Wisconsin
|
|
Construction Cost: |
$15,843,800
|
|
AE Submittal Date: |
9/24/1999 |
|
Last Item Update: |
4/21/2000 3:26:58 PM |
|
Selected AE: |
Boldt Construction & Venture Architects |
|
|
Project No.:
|
99H3B
|
|
Project Name: |
DOC WCC 150 Bed Work House
|
|
Institution: |
CORRECTIONS/WINNEBAGO CORRECTION CENTER
|
|
Location: |
CITY OF OSHKOSH, Wisconsin
|
|
Construction Cost: |
$5,120,000
|
|
AE Submittal Date: |
9/23/1999 |
|
Last Item Update: |
4/21/2000 2:54:43 PM |
|
Selected AE: |
PTD, Inc. |
|
|
Project No.:
|
99H3D
|
|
Project Name: |
DOC VARIOUS Prob/Parole Hold Fac-4 Locat
|
|
Institution: |
CORRECTIONS/VARIOUS
|
|
Location: |
VILLAGE OF STURTEVANT, Wisconsin
|
|
Construction Cost: |
$22,789,000
|
|
AE Submittal Date: |
9/22/1999 |
|
Last Item Update: |
4/21/2000 3:23:27 PM |
|
Selected AE: |
Durrant Architects in association with Durrant Eng |
|
|
Project No.:
|
99I1Q
|
|
Project Name: |
DOC HIGH Correctional Institution
|
|
Institution: |
CORRECTIONS/GERIATRIC OFFENDER-NORTHERN WISCONSIN CENTER
|
|
Location: |
CITY OF CHIPPEWA FALLS, Wisconsin
|
|
Construction Cost: |
$7,294,000
|
|
AE Submittal Date: |
9/21/1999 |
|
Last Item Update: |
4/21/2000 3:28:49 PM |
|
Selected AE: |
PTD, Inc. |
|
|
Project No.:
|
99E2I
|
|
Project Name: |
DOC WCI Visitors Center Renovation
|
|
Institution: |
CORRECTIONS/WAUPUN CORRECTIONAL INSTITUTION, WAUPUN
|
|
Location: |
CITY OF WAUPUN, Wisconsin
|
|
Construction Cost: |
$7,604,900
|
|
AE Submittal Date: |
9/17/1999 |
|
Last Item Update: |
4/21/2000 2:59:46 PM |
|
Selected AE: |
Venture Architects |
|